Opportunity

City of Sunrise Demandstar #BID-26-71-05-HR-0-2026/hr

Drainage Improvements and Culvert Reinforcement for Basin 15 in City of Sunrise, FL

Posted

May 22, 2026

Respond By

June 25, 2026

Identifier

BID-26-71-05-HR-0-2026/hr

NAICS

237110, 237310, 237990, 238190

This opportunity involves drainage infrastructure improvements for the City of Sunrise, Florida, focusing on the Hiatus Road Canal Culvert within Basin 15. - Government Buyer: - City of Sunrise, Florida (local government) - Project Scope: - Installation of a new 54-inch reinforced concrete pipe (RCP) parallel to the existing 54-inch RCP culvert - Rerouting of street drainage to the new culvert - Sediment and turbidity control, pollution prevention, and site clearing/grubbing - Maintenance of traffic, dewatering, and canal bypass pumping during construction - Construction of two endwalls and two manhole structures - Demolition of existing structures, restoration of pavement, curbs, and pavement markings - Pavement milling and resurfacing, sodding, and preparation of as-built record drawings - Products/Services Requested: - 54-inch reinforced concrete pipe (RCP) - Construction and site restoration services (sediment control, traffic management, dewatering, demolition, landscaping, documentation) - Unique/Notable Requirements: - Work is within a 496-acre drainage basin - Contractors must manage water and traffic during construction - As-built record drawings required upon completion - No specific OEMs or vendors are named in the solicitation - Estimated project budget is $1,123,000

Description

This project involves drainage improvements within the 496-acre City of Sunrise Drainage Basin 15. The work focuses on the Hiatus Road canal crossing between NW 53rd Street and NW 55th Street, including installation of a 54" reinforced concrete pipe parallel to the existing culvert to upgrade hydraulic flow capacity. The scope includes sediment and turbidity control, clearing, maintenance of traffic, dewatering, canal bypass pumping, construction of endwalls and manholes, demolition, pavement restoration, and sodding. Contractors must attend a non-mandatory pre-bid conference and site visit at City Hall on June 8, 2026.

View original listing