Opportunity

La Crosse Questcdn #7588062

Award for Commerce Street Reconstruction Project in La Crosse, Wisconsin

Posted

March 04, 2021

Respond By

March 04, 2021

Identifier

7588062

NAICS

237310, 237110, 237990, 238110

This opportunity involves the award of the Commerce Street Reconstruction project in La Crosse, Wisconsin, managed by the City of La Crosse Engineering Department. - Government Buyer: - City of La Crosse, Wisconsin (Engineering Department) - Awarded Vendor: - Chippewa Concrete Services - Other bidders: Gerke Excavating Inc., St. Joseph Construction Co., Fowler & Hammer, Inc., A-1 Excavating LLC, McCabe Construction, Pember Companies, Inc. - Products/Services Requested: - Removal and installation of concrete and bituminous pavement, curbs, gutters, and flatwork - Storm sewer work: manhole finishing, catch basin connections, ring replacements, bio-cell excavation and installation, culvert pipe - Sanitary sewer work: manhole finishing, ring replacements - Erosion control, restoration (hydro), temporary traffic control, ribbon curb, and swale outlet - Quantities range from hundreds to thousands of linear feet, square feet, and cubic yards for each construction activity - Detailed line items include: - Sawing (concrete: 278 LF, bituminous: 1020 LF) - Remove concrete curb & gutter (3460 LF), flatwork (5225 SF), bituminous pavement (7735 SY) - Base course (7689 SY), concrete flatwork (6") (5500 SF), high-early concrete flatwork (2000 SF) - Curb & gutter (standard: 2213 LF, bus stop: 50 LF, reinforced driveway: 704 LF, high-early reinforced: 200 LF) - Bituminous concrete pavement (7689 SY + 171 SY) - Erosion control (1 LS), restoration (hydro: 1800 SY), temporary traffic control (1 LS) - Storm and sanitary sewer manhole finishing (6 each), ring replacements (28 in. storm, 38 in. sanitary), catch basin connections, bio-cell installation - 12" dual wall HDPE culvert pipe (30 LF), ribbon curb (293 LF), swale outlet (1 each) - Unique/Notable Requirements: - Project covers both storm and sanitary sewer improvements, bio-cell installation for stormwater management, and a mix of high-early and standard concrete for accelerated construction - No specific OEMs or proprietary products are specified; standard civil construction materials and methods are used - No period of performance or completion date is specified in the available information.

Description

This solicitation is for the Commerce Street Reconstruction project in La Crosse, Wisconsin. The project involves construction work including removals, installations, storm sewer, and sanitary sewer work as detailed in the bid tabulation. The solicitation was posted by the City of LaCrosse's Engineering Department. The contract was awarded to Chippewa Concrete Services with a bid amount of $483,340.00. The response deadline was March 4, 2021, at 2:00 PM CST.

View original listing