Opportunity

SAM #W912DR26RA010

Design and Construction of Cyber Mission Operations Facility at Fort Meade

Buyer

USACE W2SD Endist Baltimore

Posted

May 26, 2026

Respond By

June 25, 2026

Identifier

W912DR26RA010

NAICS

237990, 238910, 236220

This opportunity seeks contractors for a major federal construction project at Fort Meade, Maryland: - Government Buyer: - U.S. Army Corps of Engineers, Baltimore District (ENDIST BALTIMORE) - Project Scope: - Design and construction of a Mission Operations Facility (MOF) for the Cyber National Mission Force (CNMF) - Approximately 750,000 gross square feet - Supports around 2,400 personnel - Flexible occupancy for mission, administrative, and support functions - Expansion of East Campus Parking Structure 4 (ECPS 4) - Adds 1,758 structured parking spaces - Construction of a pedestrian bridge connecting MOF to East Campus Building 5 (ECB 5) - Relocation of Construction Surveillance Technician (CST) trailers - On-site and off-site roadway improvements - Storm water management facilities - Site restoration and reforestation - Improvements and installation of utilities - Demolition of an existing building - Life safety generation systems - Full integration of required utilities and secure telecommunication systems - No specific OEMs or vendors are named in the solicitation - Notable Requirements: - Secure telecommunications integration - Life safety and mission-critical infrastructure - Large-scale, multi-functional facility supporting cyber operations

Description

The Cyber National Mission Force - Mission Operations Facility (CNMF-MOF) project requirements focus on the design and construction of a State-of-the-Art Mission building within the Central Campus site at Ft. Meade, Maryland. The primary facility is approximately 750,000 gross square feet (GSF) in size and will accommodate approximately 2,400 people. The state-of-the-art facility shall allow for a variety of tenant occupancy functions and flexible size and configurations to conduct the mission, administrative, and support services. The project also includes the expansion of the multi-level East Campus Parking Structure 4 (ECPS 4) for 1,758 spaces of structured parking. The overall CNMF-MOF parking requirement is 85% of the MOF projected seat count and may be accommodated through the expansion of ECPS 4 and surface parking. All required utilities, connections, and secure telecommunication distribution systems shall be fully integrated into the facilities. The project also includes but is not limited to a pedestrian bridge connecting the CNMF-MOF to the East Campus Building 5 (ECB 5); relocation of the Construction Surveillance Technician (CST) trailers; on-site/off-site roadway improvements; storm water management facilities; site restorations, reforestation; existing on-site utilities improvements; installation of new utilities; demolition of an existing building; and life safety generation. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W912DR26RA010Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module

View original listing