Opportunity
SAM #W911KB26RA039
Life Safety Repairs and Upgrades for Hangar 1, Fort Wainwright, Alaska
Buyer
W2SN ENDIST Alaska
Posted
May 26, 2026
Respond By
June 25, 2026
Identifier
W911KB26RA039
NAICS
238210, 238190, 238220
This opportunity seeks qualified small businesses to perform life safety repairs and upgrades at Hangar 1, Fort Wainwright, Alaska: - Government Buyer: - U.S. Army Corps of Engineers, Engineer Division Pacific Ocean, Endist Alaska (W2SN ENDIST ALASKA) - Scope of Work: - Install new electrical power on the southeast side of Hangar 1 to support Black Hawk Aircrew Trainer (BAT) and Transportable Flight Procedure Simulator (TFPS), including their ECU units - Electrical requirements: two 120/208v, 200 amp, 60Hz, three phase, 4 wire plus ground services - Use of MS980555C52412S or MS90555C52143S receptacles for each device - Connect simulators to the fire alarm system - Convert bay areas to a wet pipe sprinkler system - Correct egress deficiencies and install code-required emergency lighting - Install expanded metal mesh in a prefab arms vault to comply with AR190-11 Tab G for Arms Room use - Update existing fire system to meet current building codes as needed - Unique/Notable Requirements: - The building is designated as historical, requiring coordination with the State Historic Preservation Office (SHPO) for compliance with preservation laws and regulations - Construction cost limitation is $18,000,000 - Performance period is approximately 600 calendar days - No specific OEMs or vendors are named in the solicitation - Place of Performance: Hangar 1, Fort Wainwright, Alaska
Description
This is a solicitation notice for a total small business set aside design build Request for Proposal (RFP) to install power on the southeast of Hangar 1 to accommodate the Black Hawk Aircrew Trainer (BAT) and the Transportable Flight Procedure Simulator (TFPS) including the ECU units for each device. Electrical requirements for each device are: two 120/208v, 200 amp, 60Hz, three phase, 4 wire plus ground services with MS980555C52412S or MS90555C52143S receptacles. The project will connect Simulators to the Fire Alarm System, converting bay areas to a wet pipe sprinkler system, and correct egress deficiencies and other life safety repairs needed to ensure life safety including code required egress/emergency lighting and the like. Finally, the project will also install expanded metal mesh in a prefab arms vault that was installed in the structural repair project (FTW433) to be in compliance with AR190-11 Tab G to be used as an Arms Room. Updates to the existing fire system to meet current building codes may be required. This building has been identified as a historical building. Coordination with the SHPO will be required to ensure project will not violate any laws or regulations. The construction cost limitation for this requirement is $18,000,000. The performance period will be approximately 600 calendar days. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W911KB26RA039Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module