Opportunity
SAM #N0010426QFE18
Navy Solicitation for Flexible Connection Repair and Refurbishment Services
Buyer
NAVSUP Weapon Systems Support (WSS) Mechanicsburg
Posted
May 25, 2026
Respond By
June 08, 2026
Identifier
N0010426QFE18
NAICS
332919, 336611
NAVSUP Weapon Systems Support Mechanicsburg is seeking specialized repair and refurbishment services for a flexible connection used in critical Navy shipboard systems. - Government Buyer: - Department of Defense, Department of the Navy, NAVSUP Weapon Systems Support Mechanicsburg (NAVSUP WSS MECH) - OEMs and Vendors: - Murdock (referenced in technical drawings and part numbers) - Products/Services Requested: - Repair and refurbishment of flexible connection assemblies per Murdock Drawing 298750 and Assembly 298750-100 - Certification and possible replacement of key components: - Body (Part Number 292803-101) - Nipple (Part Number 292804-101) - Flange (Part Number 292808-101) - Socket Head Cap Screw (Item 16 on Drawing 298750) - Services include teardown, evaluation, inspection, and full repair to 'like new' or 'A' condition - Unique or Notable Requirements: - All materials must meet SAE-AMS-QQ-S-763 (Class 304, Condition A) and FF-S-86 (Alloy Steel, Cadmium Plated) standards - Self-locking elements must comply with MIL-DTL-18240 - Rigorous traceability, certification, and quality assurance are required - Testing certifications for hydrostatic, dye penetrant, and intergranular corrosion tests must be provided - Designated as SPECIAL EMPHASIS (Level I) material, invoking special control procedures and compliance with federal, military, and commercial standards - No specific purchase quantities provided - Place of Performance: - NAVSUP Weapon Systems Support Mechanicsburg, PA
Description
CONTACT INFORMATION 4 N743.24 WVQ N/A ashton.k.perry.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 |||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) 1 See specification sections C and E. INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) 2 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material N/A TBD N00104 TBD N39040 - Certifications, S4306A - Material N50286 TBD 133.2 N/A N/A N39040 - Certifications N/A SEE DD FORM 1423 | PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 WSS MECH MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003) 6 One year from date of delivery. One year from date of delivery. BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025) 1 WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026) 2 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015) 1 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENERGY PROGRAM USE (APRIL 2008) 2 1. This is a Level 1 Repair. 2. Please submit: ESTIMATED (EST) pricing or FIRM FIXED PRICE (FFP). This includes the teardown, evaluation, inspection and full repair of the item to "like new" or "A" condition. See statement of work in solicitation. Please also provide an approximate cost of new item if available. If EST, vendor shall have 90 days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price (FFP) quote for the full repair effort of the carcass(es). 3. A beyond repair (BR)/ beyond economic repair (BER) price shall also be provided in addition to the repair price at time of submission of quote. 4. Do NOT include the cost for shipping material as the government implemented shipping system or ATAC will be shipping/delivering material. 5. This contract utilizes Commercial Asset Visibility (CAV). See clause NAVSUPWSSFA24 for further details. 6. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 7. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286. 8. All contractual documents (i.e., contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 9. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 30 working days after receipt of Certification DD 1423 CDRLs. 10. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. Requested RTAT: 250 Days 11. Any contract awarded as a result of this solicitation will be a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 1. Scope 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. Applicable Documents 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer revisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: https://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions, without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g., E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listed within CSD155 or elsewhere within this contract. 2.2.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NOCAGEREVDISTR CD 29875027826KB 29280627826BB 29280827826FB 29280327826FB 29280427826EB 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. FED-STD-H28 FF-S-86 ANSI/ASQ Z1.4 ASTM-A574 ASTM-F606 MIL-STD-792 MIL-DTL-1222 MIL-STD-2035 ISO_9001 ISO10012 MIL-DTL-15024 ISO/IEC 17025 MIL-DTL-18240 QPL 18240 MIL-I-45208 MIL-STD-45662 SAE AMS-QQ-P-416 SAE AMS-QQ-S-763 ANSI/NCSL Z540.3 0900-LP-001-7000 0900-LP-003-8000 S9074-AQ-GIB-010/248 S9074-AS-GIB-010/271 S9074-AR-GIB-010A/278 (CHG A) 3. Requirements 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.1.3 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications are not required to be resubmitted by the contractor. Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications are not available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.1.4 NON-USEABLE PARTS - Any parts of the original assembly that are not properly marked as identified above must be replaced and the required certifications must be submitted. Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.1.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with Murdock Drawing 298750, Assembly 298750-100 and Maintenance Standard NO. 7540-081-012 REV F CHG-1 (CSD712); , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.6 ADDITIONAL SOW REQUIREMENTS - N/A; 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number CSD712 in ECDS at https://register.nslc.navy.mil/ 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - Body, Part Number 292803-101 on Drawing 292803; Nipple, Part Number 292804-101 on Drawing 292804; and Flange, Part Number 292808-101 on Drawing 292808; Material - SAE-AMS-QQ-S-763, Class 304, Condition A; Part - Socket Head Cap Screw, Item 16 on Drawing 298750; Material - Alloy Steel per FF-S-86, Cadmium Plated. Self-locking element in accordance with MIL-DTL-18240; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Hydrostatic Test; Item - Each Assembly; Performance - MS NO. 7540-081-012 REV F CHG-1, paragraph 1.d.(10); Acceptance - MS NO. 7540-081-012 REV F CHG-1, paragraph 1.d.(10); Test - Liquid Penetrant Inspection or Magnetic Particle Inspection (Wet Method) (Either inspection is acceptable); Item - Socket Head Cap Screw, Item 16 on Drawing 298750; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222; Acceptance - MIL-DTL-1222 Test - Non-Destructive Tests; Item - Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification; Acceptance - Per applicable fabrication specification Test - Dye Penetrant Inspection; Item - Body, Part Number 292803-101 on Drawing 292803; Nipple, Part Number 292804-101 on Drawing 292804; and Flange, Part Number 292808-101 on Drawing 292808; Performance - T9074-AS-GIB-010/271; Acceptance - MIL-STD-2035 or 0900-LP-003-8000; Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining); Item - Body, Part Number 292803-101 on Drawing 292803; Nipple, Part Number 292804-101 on Drawing 292804; and Flange, Part Number 292808-101 on Drawing 292808; Performance - SAE-AMS-QQ-S-763; Acceptance - SAE-AMS-QQ-S-763 3.5 Hydrogen Embrittlement Relief - Plated/coated fasteners and fasteners per paragraph 3.7 of MIL-DTL-1222 require hydrogen embrittlement relief heat treatment in accordance with SAE-AMS-QQ-P-416 for cadmium plated fasteners, HRC 33 and above or 150 KSI and above. Certification is required. 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported as part of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. 3.7.1 Testing for Socket Head Cap Screws must be in accordance with MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.7.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16. For all other grades, the following wedge angles must be used: a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedge Sizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.7.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one "test specimen fastener" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot. 3.8 FF-S-86 mechanical property and metallographic testing sample sizes must use ASQ Z1.4 Inspection Level S-1 with AQL = 4.0. NOTE: The sample size values must conform to either FF-S-86 Revision E and earlier revisions or FF-S-86 Revision J and later revisions. 3.8.1 Chemical Analysis of FF-S-86 screws of ASTM-A574 material must be per Supplementary Requirement S1; Specific Grade Chemical Composition. 3.9 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number (CID T006320308) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.10 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of the commercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.12 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs that would exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.13 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.14 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.15 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.15.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. Number of units (and serial/lot numbers) to be delivered in this configuration. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.15.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.15.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: The change priority, change classification (Class I or Class II), and change justification. A complete description of the change to be made and the need for that change. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. Proposed changes to documents controlled by the Government. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. Recommendations about the way a retrofit should be accomplished. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. Impacts to the operational use of the product. Complete estimated life-cycle cost impact of the proposed change. Milestones relating to the processing and implementation of the engineering change. 3.16 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.17 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17, NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for Government Use Only. Further application of the above documents is prohibited. 3.17.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. Quality Assurance Requirements 3.18 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.19 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.19.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.19.2 If the Contractor's qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. 3.19.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.19.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.19.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.19.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.19.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.19.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.19.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.19.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.19.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: Filler Metal LOT number(s) Specification and Type A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.19.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.20 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.20.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.20.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.20.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.20.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.20.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.21 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.21.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.21.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.22 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g., calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.22.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.22.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.22.3 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.22.4 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.22.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.23 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: Visual examination upon receipt to detect damage during transit. Inspection for completeness and proper type. Verification of material quality received. Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. Identification and protection from improper use or disposition. Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. Material returned to the contractor must be handled as GFM. 3.24 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.24.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.25 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.25.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.25.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.25.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.25.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. 3.26 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. Re-identification and re-certification of material is required when the material is subjected to a process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g., alloying, heat treating, or forming). The properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification for chemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). Electronic signature applications must not allow unauthorized users to change electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. In cases of foreign certification, conversion of foreign language units of measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. The certification data requirements contained in this appendix must be invoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.27 Material Handling - The written material control process must include the following: All raw materials must have traceability markings (except as specified below). Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.28 Receiving inspection - Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.29 Discrepancy reporting - Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.30 Final Inspection - The following inspections must...