Opportunity
SAM #W912DY26RA086
Environmental Sampling and Pre-Demolition Survey Services at NASA Wallops Flight Facility, VA
Buyer
USACE Engineering Support Center Huntsville
Posted
May 22, 2026
Respond By
June 04, 2026
Identifier
W912DY26RA086
NAICS
562910, 238910, 541620
This opportunity involves environmental sampling and pre-demolition survey services at NASA Wallops Flight Facility, Wallops Island, VA, managed by the U.S. Army Corps of Engineers, Huntsville Engineering Support Center. - Government Buyer: - U.S. Army Corps of Engineers, Engineering and Support Center, Huntsville - Facilities Reduction Program and KO Contracting Division - Scope of Work: - Environmental sampling of 19 buildings for asbestos-containing materials (ACM), other regulated materials (ORM), lead-based paint (LBP), and PCBs-in-paint - Waste stream analysis for RCRA 8 metals - Laboratory testing and analysis - Preparation and submission of Accident Prevention Plan, sampling plan, and Pre-Demolition Assessment Report - Project management and consulting services, including up to 80 hours of Senior Industrial Hygienist labor - Products/Services Requested: - Pre-demolition environmental survey and sampling services (no specific product brands or part numbers) - Comprehensive pre-demolition surveys including all necessary personnel, labor, supervision, materials, and equipment - Unique/Notable Requirements: - Compliance with federal, state, and local environmental regulations - Security, safety, and cybersecurity requirements, including CMMC Level 2 - Thorough access to facility exteriors, roofs, basements, and crawl spaces; reporting on inaccessible areas - Set-aside for Women-Owned Small Businesses (WOSB) under NAICS code 238910 - Award based on lowest price technically acceptable - Place of Performance: - NASA Wallops Flight Facility, 175 Chincoteague Rd, Wallops Island, VA 23337 - Contracting office at Redstone Arsenal, AL - No specific OEMs or commercial vendors are named in the solicitation.
Description
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.