The Town of Arlington, Massachusetts is seeking bids for its 2026 Annual Construction of Curb Cuts, Curb Ramps, and Sidewalks project. - Government Buyer: - Town of Arlington, Department of Public Works - Office of the Town Manager/Purchasing Department - Scope of Work: - Construction of ADA-compliant concrete curb ramps and new concrete sidewalks - Replacement of existing concrete and bituminous (asphalt) sidewalks - Installation and resetting of granite curbs (straight, curved, return stones) - Installation of ADA detectable warning panels in curb ramps - Related site work: excavation, gravel subbase, saw cutting, hot mix asphalt, cobblestones, fieldstone, landscape timbers, mortar repair, loam, seeding, and rolling - Temporary removal and resetting of street signs and USPS mailboxes - Products/Materials Requested (selected line items): - Unclassified excavation (240 cubic yards) - Gravel borrow for ramps, roadways, and sidewalks (125 cubic yards) - Fine grading and compaction (575 square yards) - Granite curbs (various types, over 400 linear feet total) - Concrete sidewalks (210 square yards) and driveways (25 square yards) - Concrete curb ramps (340 square yards) - ADA detectable warning panels (27 each) - Cobblestones, fieldstone, landscape timbers, loam, and seeding - Notable Requirements: - All work must comply with ADA standards and Massachusetts/Federal prevailing wage laws - OSHA 10-hour construction safety course required for all workers - Project is partially funded by a Community Development Block Grant (CDBG) - Work is limited to standard weekday hours; no weekends or holidays without permission - No specific OEMs or proprietary products are named; materials such as granite curbs and ADA panels must meet applicable standards - Estimated annual construction cost: $150,000 - Contract duration: May to December, with two possible one-year renewals
Description
The Town of Arlington is soliciting sealed bids for the 2026 Annual Construction of Curb Cuts, Curb Ramps & Sidewalks. The project involves new cement concrete sidewalks, replacement of existing concrete and bituminous concrete sidewalks, and new cement concrete curb ramps. The estimated annual construction cost is $150,000. The contract will commence around May 15, 2026, and end December 31, 2026, with possible renewals for two additional one-year terms. Bidding procedures follow Massachusetts General Laws Chapter 30 Section 39M, and prevailing wage laws apply.