Opportunity
Tigard Granicus #2026-15
City of Tigard Solicits Construction of Steve Street Park with RCP Shelters OEM Structure
Posted
April 27, 2024
Respond By
April 28, 2026
Identifier
2026-15
NAICS
237310, 237990
The City of Tigard, Oregon is seeking bids for the construction of Steve Street Park, a comprehensive public park development project. - Government Buyer: - City of Tigard, Contracts and Purchasing Department - Key OEM Highlight: - RCP Shelters, Inc. is specifically named as the OEM for the permanent hexagonal shelter (model TS-HEX12-04) - Products and Materials Requested: - Permanent Hexagonal Shelter, 12' diameter (RCP Shelters, Inc., TS-HEX12-04) - Playground equipment: swing set (3-bay), leaf climber, small round climber, wobble board (leaf), accessible whirl spinner, log pile climber, notched posts - Safety surfacing: engineered wood fiber (over 1,000 SF), synthetic grass (over 4,700 SF) - Site furnishings: picnic tables, trash receptacles, bike racks, drinking fountain, salvaged log seating and steppers - Concrete and civil works: driveways, sidewalks, curbs (standard, mountable, raised), seat walls, vehicular and pedestrian walks, playground curbs - Utilities: potable water pipes (1" and 6" DI), gate valves, tapping sleeve and valve assembly, storm drainage pipes (PVC and perforated), manholes, inlets, cleanouts - Irrigation system: fully automatic - Electrical: conduit, conductors, power distribution, LED pole lighting - Fencing: chain link (6' and 4'), double and single gates - Landscaping: trees (1.5" and 2" caliper), container plants, bark mulch, soil conditioner, topsoil, root barrier, wood chip mulch, basalt boulders, steel edging - Park signage: playground rules sign, park entry sign - Services Requested: - General conditions and project management - Traffic and erosion control, pollution control plan - Construction survey, mobilization, clearing and grubbing, general excavation - Installation of all park features, utilities, and landscaping - Extra work as authorized by the engineer - Notable Requirements: - Compliance with Oregon prevailing wage laws and construction regulations - Performance and payment bonds, bid security required - All materials must be new; substitutions require written approval - 120-calendar-day completion period with liquidated damages for delays - One-year warranty from substantial completion - Adherence to geotechnical, civil, and environmental standards - Bidders must be registered with the Oregon Construction Contractors Board
Description
The City of Tigard is soliciting bids for the construction of Steve Street Park. The project includes traffic control, erosion and sediment control, general excavation, construction of asphaltic pavements, concrete curbs, ramps, walks, and walls, installation of playground structures, storm drainage pipe and facilities, water pipe and structures, landscaping including sensitive area plantings and irrigation, conduit, wiring, and park lighting. Bidders must submit electronic bids by April 28, 2026, at 2:00 PM local time. The engineer's cost estimate for the project is between $1.75 million and $2 million.