Opportunity

SAM #N0010426QFE19

Procurement of Nickel-Copper-Aluminum Alloy Metal Bars for Shipboard Systems

Buyer

NAVSUP Weapon Systems Support (WSS) Mechanicsburg

Posted

May 21, 2026

Respond By

June 05, 2026

Identifier

N0010426QFE19

NAICS

331491, 423510

NAVSUP Weapon Systems Support Mechanicsburg is seeking nickel-copper-aluminum alloy metal bars for critical shipboard systems. - Government Buyer: - Department of Defense - NAVSUP Weapon Systems Support Mechanicsburg - OEMs and Vendors: - Approved test laboratories include: Huntington Alloys, Metallurgical Consultants, Naval Surface Warfare Center Carderock Division, Teledyne Allvac, Westmoreland Mechanical Testing, Mannesmann Rohrenwerke, ThyssenKrupp VDM USA - Products/Services Requested: - Nickel-copper-aluminum alloy metal bars (UNS N05500) - Specification: QQ-N-286 - Condition: Annealed and age-hardened - Size: Hexagon, 1 5/16 inches - Quantity: Not specified - Required inspections: Ultrasonic, dye penetrant, macroetch, slow strain rate tensile tests - Testing must be performed by approved laboratories - Unique/Notable Requirements: - Material is classified as SPECIAL EMPHASIS (Level I) due to safety-critical application - Strict traceability, marking, and quality assurance standards (ISO-9001, ISO-10012, ANSI-Z540.3, ISO-17025, MIL-I-45208, MIL-STD-45662) - Certification data for all tests must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to shipment - Early and incremental delivery is acceptable at no additional cost

Description

CONTACT INFORMATION 4 N743.4 WVB 1 771-229-0743 amanda.l.bailey50.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) 1 See specification sections C and E INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) 2 INSPECTION AND ACCEPTANCE - SHORT VERSION 8 X X GENERAL INFORMATION-FOB-DESTINATION 1 B WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material N/A TBD N00104 TBD N39040 N50286 TBD 133.2 N/A N/A S4306A - Material N/A N/A See DD1423 PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003) 6 365 days after acceptance of material 365 days after acceptance of material BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026) 2 WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026) 2 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026) 1 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENERGY PROGRAM USE (APRIL 2008) 2 X 1. Data Item A001 (inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mech. 2. NAVSUP WSS Mech will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 45 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 4. This procurement is issued pursuant to Emergency Acquisition Flexibilities. 5. A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, the permissible variation shall be limited to +0% / -5% and applies to the total contract quantity. 6. FAR 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance is changed from 7 days to 45 days after delivery of the supplies in accordance with the terms and conditions of the contract. 7. This requirement has no Government source inspection. Inspection and Acceptance will occur at destination/destination. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1

View original listing