Opportunity
PIEE #W912DY26RA086
Pre-Demolition Environmental Survey Services at NASA Wallops Flight Facility, VA
Buyer
USACE Engineering Support Center Huntsville
Posted
May 21, 2026
Respond By
June 04, 2026
Identifier
W912DY26RA086
NAICS
238910, 562910
This opportunity seeks specialized environmental survey services for pre-demolition activities at NASA Wallops Flight Facility in Virginia. - Government Buyer: - U.S. Army Corps of Engineers, Engineering and Support Center, Huntsville (Facilities Reduction Program) - KO Contracting Division, Redstone Arsenal, AL - Scope of Work: - Pre-demolition environmental surveys for 19 buildings at NASA Wallops Flight Facility - Sampling and analysis for hazardous materials: - Asbestos-containing materials (ACM) - Other regulated materials (ORM) - Lead-based paint (LBP) - PCBs-in-paint - RCRA 8 metals - Waste stream analysis and quantification of contamination - Preparation of Accident Prevention Plan, sampling plan, and Pre-Demolition Assessment Report - Project management and consulting support (up to 80 hours of Senior Industrial Hygienist labor) - Compliance with federal, state, and local environmental regulations - Adherence to security, safety, and cybersecurity requirements (including CMMC Level 2) - Products/Services Requested: - No specific OEMs or proprietary products are named; the requirement is for professional environmental services and laboratory analysis - Unique/Notable Requirements: - 100% set-aside for Women-Owned Small Businesses (WOSB) - All labor, materials, equipment, and personnel must be provided by the contractor - Documentation of inaccessible areas in the final report - Strict schedule for laboratory testing, analysis, and reporting - Award based on lowest price technically acceptable (LPTA) - Place of Performance: - NASA Wallops Flight Facility, Wallops Island, VA - Contracting office at Redstone Arsenal, Huntsville, AL
Description
PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA. The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.