Opportunity

MyVendorLink #1560 Dolgner Place Building Construction

Construction of One-Story Commercial/Industrial Building for Seminole County Port Authority

Posted

May 09, 2026

Respond By

June 16, 2026

Identifier

1560 Dolgner Place Building Construction

NAICS

236210, 236220, 238190

This opportunity involves the construction of a new one-story commercial/industrial building for the Seminole County Port Authority at 1560 Dolgner Place in Sanford, Florida. - Government Buyer: - Seminole County Port Authority - Products and Services Requested: - Pre-engineered metal building system (1 unit) - Metal roof and siding on reinforced concrete slab-on-grade foundation - Aluminum storefront windows - Hollow metal doors and frames - Overhead coiling doors - Fixed metal louvers - Roof and wall insulation - Interior metal stud and gypsum partitions - Solid core wood doors - Acoustical tile ceilings - Resilient tile flooring and base - Toilet accessories - Fire protection cabinets and extinguishers (no sprinkler or fire alarm system) - Architectural casework - Solid surfacing countertops - Ceramic tiling - Plumbing fixtures and piping - HVAC equipment and ductwork - Electrical work - Interior and exterior painting - Unique or Notable Requirements: - Building will not include a sprinkler or fire alarm system - Bid bond of 5% and performance bond of 100% required - No specific OEMs or manufacturers are named in the solicitation - Place of Performance: - 1560 Dolgner Place, Sanford, Florida (Seminole County Port Authority facility)

Description

This project involves the construction of a one-story commercial/industrial building using a pre-engineered metal system with metal roof and siding on a reinforced concrete slab-on-grade foundation. The scope includes aluminum storefront windows, hollow metal doors and frames, overhead coiling doors, fixed metal louvers, roof and wall insulation, interior metal stud and gypsum partitions, solid core wood doors, acoustical tile ceilings, resilient tile flooring and base, interior and exterior painting, toilet accessories, pre-protection cabinets and extinguishers, architectural casework, solid surfacing countertops, ceramic tiling, plumbing fixtures and piping, HVAC equipment and ductwork, and electrical work. The building will not be sprinklered or fire alarmed. Bid bond and performance bond are required for this project.

View original listing