Opportunity

New York State Contract Reporter #012026

Boiler System Replacement for Canisteo Police Department (Weil McLain or Dunkirk Preferred)

Posted

May 21, 2026

Respond By

June 09, 2026

Identifier

012026

NAICS

238220

The Village of Canisteo is seeking bids for a comprehensive boiler system replacement at its Police Department facility in Canisteo, NY. - Government Buyer: - Village of Canisteo, managed by the Village Clerk - Treasurer - OEMs (Original Equipment Manufacturers): - Weil McLain (preferred for boiler) - Dunkirk (preferred for boiler) - Products Requested: - 1 natural gas 210K BTU combi-boiler (Weil McLain or Dunkirk preferred, 95% AFUE or greater) - 3 high efficiency circulator pumps (to replace existing units) - 3 energy efficient thermostats (one per heating zone) - 1 natural gas hydronic unit heater (200K BTU, for garage) - Services Requested: - Complete removal of existing boiler system and related equipment - Installation of new boiler, pumps, thermostats, controls, gas piping, vents, supply and return headers - Tracing and updating of heating zones (first floor, second floor, garage) - Installation of all necessary controls and separation of heating zones - Notable Requirements: - Boiler must be rated at least 95% AFUE (energy efficiency) - Preferred OEMs are Weil McLain or Dunkirk, but alternatives meeting specifications may be considered - Compliance with New York State prevailing wage requirements - Site visits encouraged for accurate assessment - Place of Performance: - Police Department, 35 Main Street, Canisteo, NY 14823 - Contract Duration: - 6-month term, with work to be completed and system operational by early fall

Description

This solicitation is for the replacement of the boiler system at the Police Department located at 35 Main Street, Canisteo, NY. The scope of work includes locating and updating heating zones on the first and second floors, replacing circulator pumps with high efficiency models, installing new energy efficient thermostats, and furnishing and installing a new natural gas combi-boiler rated at 95% AFUE or greater. Additional work includes installing all necessary controls, gas, vents, piping, building supply and return headers, installing a natural gas hydronic unit heater in the garage, and removing existing equipment. The project is managed by the Village Clerk - Treasurer of Canisteo, NY.

View original listing