Opportunity
SAM #W50S8S26QA009
180th Fighter Wing Lift Station Repair: Gorman-Rupp Pump and Allen-Bradley Soft Starter Replacement
Buyer
W7NU USPO Activity OHANG 180
Posted
May 20, 2026
Respond By
June 08, 2026
Identifier
W50S8S26QA009
NAICS
237110, 238220, 238210
This opportunity involves the repair and upgrade of the main lift station (#3) at the 180th Fighter Wing in Swanton, Ohio: - Government Buyer: - United States Department of Defense, Department of the Army, National Guard Bureau, and U.S. Air Force (180th Fighter Wing, 180th Civil Engineer Squadron) - OEMs (Original Equipment Manufacturers): - Gorman-Rupp (submersible pump) - Allen-Bradley (soft starter) - Products Requested: - Gorman-Rupp SF Series submersible pump (Model SFV4D), quantity: 1 - Allen-Bradley soft starter (like-for-like replacement for SMC Flex model), quantity: 1 - Services Requested: - Removal and environmentally compliant disposal of failed pump and soft starter - Procurement and installation of new Gorman-Rupp pump and Allen-Bradley soft starter - NEC-compliant electrical integration, system start-up, operational testing, and commissioning - Delivery of technical submittals, as-built drawings, and O&M manuals - Unique/Notable Requirements: - Brand name or fully compatible replacements required to ensure system compatibility and avoid costly redesigns - All work must comply with Department of Labor Wage Determination and be completed within 90 days of contract award - Strict adherence to safety, security, and quality standards - Place of Performance: - 180th Fighter Wing, 2660 S Eber Rd, Swanton, OH 43558 (including specific buildings such as Bldg 105 Warehouse and Bldg 158)
Description
DESCRIPTION:
The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS).
SCOPE OF WORK: The required services include, but are not limited to, the following:
Removal & Disposal: Safe removal and environmentally compliant disposal of the existing failed submersible pump and soft starter components. Brand Name Installation:
<ul>
<li>
<p>Procurement and installation of one (1) new <strong>Gorman-Rupp SF Series submersible pump (Model SFV4D)</strong>.</p>
</li>
<li>
<p>Procurement and installation of one (1) new <strong>Allen-Bradley soft starter</strong> (fully compatible, like-for-like replacement for the existing SMC Flex model).</p>
</li>
</ul>
</li>
<li>
<p><strong>Integration & Testing:</strong> Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration.</p>
</li>
<li>
<p><strong>Deliverables:</strong> Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals.</p>
</li>
PERIOD OF PERFORMANCE: All work must be completed within 90 calendar days after the date of contract award.
CONTRACTOR RESPONSIBILITES:
In accordance with the PWS and federal labor laws, the contractor is responsible for:
Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category. Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals. Testing: Conducting full operational testing and start-up to verify system restoration. Documentation: Ensuring as-built drawings are provided upon project completion.
*See Attchments