Opportunity

City of Laredo Ionwave #FY23-ENG-18 Addendum 3

City of Laredo El Metro Transit Center Building Maintenance and Facility Upgrades

Posted

April 19, 2026

Respond By

May 28, 2026

Identifier

FY23-ENG-18 Addendum 3

NAICS

238220, 238290

The City of Laredo is seeking bids for a comprehensive building maintenance and facility improvement project at the El Metro Transit Center in Laredo, Texas. - Government Buyer: - City of Laredo (Engineering Department, Building Development Services, Purchasing, and City Secretary's Office) - OEMs and Vendors (Acceptable/Equivalent Manufacturers): - PACE (air handling units) - Spirotherm (hydronic specialties/air & dirt separators) - Grundfos (chilled water pumps) - Elbi (expansion tanks) - Bosch-TempMaster (DX split systems) - Tutco/Warren (duct heaters) - ABB (variable frequency drives) - Products/Services Requested: - Replacement of 5 chilled water air handling units (PACE or equivalent) - Replacement of 2 chilled water pumps with VFDs (Grundfos, ABB or equivalent) - Replacement of 1 DX split system (20 ton, Bosch-TempMaster or equivalent) - New expansion tanks (Elbi or equivalent) - New duct heaters (Tutco/Warren or equivalent) - Hydronic specialties (Spirotherm or equivalent) - New building automation/HVAC controls system (BAS/EMCS) - New public address system - Selective demolition of masonry veneer and concrete flatwork - Masonry repairs and restoration (including façade and slab repairs) - Electrical system upgrades (disconnects, panels, lighting, PA system, smoke detectors, thermostats) - Installation of a Level 3 ballistic resistant vestibule wall - Temporary portable HVAC units for cooling during construction - Safety and pedestrian management during construction - IT equipment installation (allowance for data outlets, cabling, hardware, UPS) - Unique/Notable Requirements: - Phased construction in an occupied, operational transit facility - Temporary cooling to maintain building operations - Compliance with Build America, Buy America Act (BABA) and federal labor standards - Allowances for general construction betterments ($125,000) and IT equipment ($50,000) - Strict safety, pedestrian protection, and outage management plans - Equivalent manufacturers allowed for key HVAC components - Ballistic resistant vestibule installation for enhanced security - All work must comply with city ordinances, OSHA, and federal standards

Description

The City of Laredo is soliciting bids for the El Metro Transit Center Building Maintenance Project, which includes general maintenance, selective demolition of exterior masonry veneer, concrete flatwork, and replacement of HVAC air handler units, associated ductwork, chilled water lines, and control system wiring. The project also involves repairs to building masonry veneer, introduction of a new HVAC controls system, and a new public address system as per the plans and specifications prepared by Sepulveda Associates Architects, Inc. The construction contract time is 240 working days. Bidders must submit sealed bids either electronically or by hand delivery, accompanied by a bid deposit of at least 5% of the total base bid.

View original listing