Opportunity
Apex Civicplus #RFQ FOR TOWN OF APEX JENKS SUBSTATION DESIGN
Engineering Design Services for Jenks 230kV Substation in Apex, NC
Posted
May 07, 2026
Respond By
June 11, 2026
Identifier
RFQ FOR TOWN OF APEX JENKS SUBSTATION DESIGN
NAICS
541330
The Town of Apex Electric Department is seeking engineering firms to design a new 230kV Jenks Substation to support growth in its western service territory near US Highway 64. - Government Buyer: - Town of Apex Electric Department, Electric Utilities Department, Apex, NC - OEMs and Vendors Referenced: - No specific OEMs are being solicited for engineering services, but equipment references include: - GW Vipers (reclosers) - Eaton Nova TS (reclosers) - GE VR 1 (regulators) - Eaton/Cooper Quickstep (regulators) - Products/Equipment Requested: - 40 MVA 230kV-24kV transformer (1 unit) - 2,000A bus system (1 unit) - 600A reclosers (GW Vipers or Eaton Nova TS, 3 units) - 576 KVA regulators (GE VR 1 or Eaton/Cooper Quickstep, 3 units) - Prefabricated control house (1 unit) - 48V DC battery control system (1 unit) - 240/120V station power (1 unit) - Services Requested: - Comprehensive engineering design, calculations, and construction documents - Protection, controls, metering, feeder layout - Site surveys, grading, plats, easement maps - Bidding assistance, construction administration, and observation - Unique/Notable Requirements: - Bus work must match existing town substation configurations - Design must allow for future expansion (additional feeders and transformer) - Detailed SOQ submission requirements for firm experience and personnel - Transformer delivery scheduled for first quarter of 2028 - Place of Performance: - Substation site near US Highway 64, Apex, NC - Town of Apex Electric Utilities Department (PO Box 250, Apex, NC 27502)
Description
The Town of Apex Electric Department is seeking engineering services for the design of a new 230kV substation to support growth in the western service territory near US Highway 64. The project includes design and engineering calculations, construction documents, bid packages, and substation drawings for a 40 MVA transformer with provisions for future expansion. The scope covers site surveys, grading, construction plans, environmental permits, bidding assistance, and construction administration. Interested firms must submit a Statement of Qualifications by June 11, 2026.