Opportunity

New York State Contract Reporter #2135349

ADA-Compliant Bathroom Renovation at Broome DDSOO Main Campus

Posted

May 20, 2026

Respond By

June 25, 2026

Identifier

2135349

NAICS

238390

This opportunity involves a comprehensive renovation of bathroom 5A18 at the Broome DDSOO Main Campus in Binghamton, NY, to achieve ADA compliance. - Government Buyer: - New York State Office for People with Developmental Disabilities (OPWDD), Broome Developmental Center (Broome DDSOO) - OEMs and Vendors Specified: - STAINMASTER (wall/floor tile) - Affinity Tile (floor tile) - Design House (double vanity top) - Sloan (flush valve) - Grainger (toilet paper and paper towel dispensers) - NYSID (hand soap dispenser) - Bobrick (waste receptacle, liner mates) - Provent Systems (floor drain) - H.E. Williams (LED troffer light fixture) - Watts (lavatory tempering valve) - Products and Quantities: - STAINMASTER Bella Bianco, Picasso Grey 12"x24" porcelain tile (wall/floor) - Affinity Tile Metro 2" Hex Glossy Light Grey mosaic tile (floor) - Design House #597450 73" Cultured Marble Double Vanity Top, Solid White (1) - Sloan 1.6 GPF 111XL Regal flush valve - Grainger P#506K76 toilet paper dispenser - Grainger P#40AY40 Sanitouch roll paper towel dispenser - NYSID P#F6659-0000-000 hand soap dispenser - Bobrick B-43644 recessed waste receptacle, 43644-134 liner mates - ADA-compliant grab bars (various sizes), mirrors, hooks, seat cover dispensers, tissue dispensers - Solid surface countertops (EH-1209, EH-1212, EH-1218, EH-1824) - Provent Systems floor drain with trap guard - Watts LFUSG-B lavatory tempering valve - H.E. Williams LT-24-L40/830-AF-EM/10W-LV-ZLS05-ILW-UNV LED troffer light fixture - Water hammer arrester (WHA-1), water closet carrier, wall-mounted fire alarm strobe unit - Services Requested: - Complete bathroom demolition and remodeling - Installation of all specified fixtures and accessories - Plumbing, electrical, and HVAC work - ADA compliance throughout - Debris removal, site clean-up, and third-party electrical inspection - Notable Requirements: - All work must comply with 2025 NYS Building, Fire, Energy, Plumbing, Mechanical Codes, and 2023 National Electrical Code - Prevailing wages required; vendors must be registered with NYS Department of Labor - Mandatory site visit prior to quote submission - One-year warranty on parts and labor - Certified payroll submission required - Work must be completed within 30 days of purchase order; contract term is 60 days from award

Description

The NYS Office for People with Developmental Disabilities, Broome Developmental Center, is requesting quotes for the renovation of the 5A18 bathroom to create an ADA compliant toilet room. The project includes removal and replacement of fixtures, tiles, plumbing, electrical, and ventilation work as per the attached scope and drawings. Attendance at a mandatory site visit on 6/11/26 is required before submitting a quote by 6/25/26. This is a public works project requiring prevailing wages and NYS Dept of Labor registration for vendors.

View original listing