Opportunity

SAM #F3J6AF26SS001

Network Infrastructure Upgrade at Osan Air Base, South Korea

Buyer

Air Force Test Center

Posted

May 20, 2026

Respond By

May 26, 2026

Identifier

F3J6AF26SS001

NAICS

238210, 237130

This opportunity seeks market research for a network infrastructure upgrade at Osan Air Base, South Korea. - Government Buyer: - Department of Defense, Department of the Air Force, 7th Air Force (7 AF) - Project Scope: - Installation of a complete fiber and copper horizontal distribution system in Building 933 - Fiber solution includes new fiber optic distribution panels (FODPs) with LC termination points, extending to end-user outlets with LC keystone-style connections in faceplates - Copper solution includes new copper patch panels in IT rooms, extending to end-user outlets with Category 6 (CAT6) RJ45 keystone connections in faceplates - Contractor must provide all labor, materials, supervision, tools, test equipment, pathway components, cabling, terminations, patch panels, keystones, faceplates, labeling, documentation, and incidentals - Requirements: - Compliance with DoD, USAF, and host nation policies, as well as security, safety, and communications infrastructure standards - Active Secret/NOFORN clearance required for contractors - OEMs and Vendors: - No specific OEMs or vendors are mentioned in the notice - Unique/Notable Requirements: - All work must be fully tested, labeled, and documented - Strict adherence to security and infrastructure standards - Place of Performance: - Osan Air Base, Building 933, Gyeonggi, South Korea - Contracting office located at AF NO MILSBILLS PROC CP, UNIT 2047 BLDG 933 OSAN AB, APO, AP 96278, USA

Description

Disclaimer To receive this requirement contractor must have an active Secret/NOFORN clearance.

 This requirement is for upgrading the network infrastructure serving Building 933 at Osan Air Base. The intent is to provide a complete, tested, labeled, and documented fiber and copper horizontal distribution system. The fiber solution begins at new fiber optic distribution panels (FODPs) with LC termination points and extends to end-user outlet locations with LC keystone-style connections installed in faceplates. The copper solution begins at new copper patch panels in the designated IT rooms and extends to end-user outlet locations with Category 6 (CAT6) RJ45 keystone connections installed in faceplates. 

The Contractor shall furnish all labor, materials, supervision, tools, test equipment, pathway components, cabling, terminations, patch panels, keystones, faceplates, labeling, documentation, and incidentals required to install the new fiber optic and copper CAT6 infrastructure. The completed work shall support Government acceptance testing and turnover to USAF Communications Squadron staff and 7 AF/A6. All work shall be performed in accordance with applicable DoD, USAF, and host nation policies within this SOW, ensuring compliance with security, safety, and communications infrastructure standards. 

To request the SOW and the drawings, please e-mail your request to the points of contact, with the neccessary documentation that shows clearance requirements.

View original listing