Opportunity

Dunedin Demandstar #ITB-26-2613-0-2026/TWS

Pumping System Replacement and Upgrades at Dunedin Advanced Wastewater Treatment Plant

Posted

April 17, 2026

Respond By

June 02, 2026

Identifier

ITB-26-2613-0-2026/TWS

NAICS

237110, 238210, 238220, 238290, 238990

This opportunity involves the replacement and upgrade of critical pumping and support systems at the City of Dunedin's Advanced Wastewater Treatment Plant. - Government Buyer: - City of Dunedin (local government) - Project location: Advanced Wastewater Treatment Plant, 1140 Martin Luther King Jr. Avenue, Dunedin, FL - Products/Services Requested: - Replacement of three Return Activated Sludge (RAS) pumps - Replacement of two Waste Activated Sludge (WAS) pumps - Replacement of three Filter Feed pumps - Installation of ductile iron and stainless steel piping and fittings - Construction of new concrete pump mounting pads - Replacement of level instrumentation and instrumentation control panel - Integration with the SCADA system - Replacement of existing aluminum access hatch - Upgrading electrical disconnects and wiring for all replaced pumps - OEMs and Vendors: - No specific Original Equipment Manufacturers (OEMs) are named in the solicitation - A list of interested vendors is provided, but manufacturers are not specified - Unique/Notable Requirements: - All work must comply with bid documents and technical specifications - Integration with existing SCADA system is required - Electrical and structural upgrades are included as part of the scope

Description

This project involves the replacement and upgrade of key pumping and support systems at the City of Dunedin’s Advanced Wastewater Treatment Plant located at 1140 Martin Luther King Jr. Avenue, Dunedin, FL. The work includes removing and replacing three Return Activated Sludge (RAS) pumps, replacing two Waste Activated Sludge (WAS) pumps, and replacing three Filter Feed pumps. Additional tasks include installing associated piping and fittings, constructing new concrete pump mounting pads, replacing level instrumentation and control panels, integrating with the SCADA system, replacing the aluminum access hatch, and upgrading electrical disconnects and wiring for all replaced pumps.

View original listing