Opportunity
Fredericksburg Civicplus #IFB 26-0039
Concrete Removal and Installation at Fire Station 2, Fredericksburg, VA
Posted
May 15, 2026
Respond By
June 15, 2026
Identifier
IFB 26-0039
NAICS
238110, 238190, 238910
This opportunity involves concrete removal and installation services for Fire Station 2 in Fredericksburg, VA. - Government Buyer: - City of Fredericksburg, Finance/Procurement Office, City Manager's Office - Products and Materials Requested: - 8-inch air-entrained, macrofiber reinforced concrete pavement (4000 PSI) for the northern driveway - Installed over a 12-inch aggregate subbase (VDOT 21A/B) - Macrofiber dosage: 5 lbs/cubic yard - Work to be completed in two phases to maintain emergency access - 4-inch microfiber reinforced concrete sidewalk (3500 PSI) for the rear sidewalk - Installed over a 4-inch VDOT 21A/B stone base - Excludes section below the outdoor mechanical unit - VDOT 21A/B aggregate subbase for both driveway and sidewalk - 26 cubic yards of VDOT 21A undercut and replacement material for soft soils - Services Requested: - Removal of existing 8-inch concrete pavement, curb, gutter, aggregate, and subgrade - Coordination of all field quality control testing with the City's designated contractor - Compliance with special inspection requirements (owner will engage a special inspector) - Unique/Notable Requirements: - All materials must meet Virginia Department of Transportation (VDOT) standards - Contractor must coordinate with the City's Field Quality Control contractor - Detailed soil and concrete testing and inspection requirements - Liquidated damages of $500 per day for delays - Contract term and completion dates to be mutually agreed upon at Notice to Proceed - No specific OEMs or commercial vendors are named; materials must comply with VDOT specifications
Description
The City of Fredericksburg is soliciting bids for the removal and installation of the concrete driveway and sidewalk at Fire Station 2, located at 101 Altoona Drive, Fredericksburg, VA 22401. The scope includes removal of existing concrete pavement, curb, gutter, aggregate, and subgrade, followed by installation of new aggregate subbase and macrofiber reinforced concrete pavement. The project also involves removal and replacement of the existing concrete sidewalk at the rear of the Fire Station, excluding the section below the outdoor mechanical unit. The contract term will be mutually agreed upon at the time the Notice to Proceed is issued.