Opportunity

Texas DIR/ESBD #IFB2026-B08

Hays County Solicits Bids for Hot Mix Asphalt Removal and Replacement on Campo del Sol Parkway

Posted

May 14, 2026

Respond By

June 08, 2026

Identifier

IFB2026-B08

NAICS

237310

Hays County, Texas is soliciting bids for the removal and replacement of hot mix asphalt pavement on Campo del Sol Parkway in the Sunfield Subdivision. - Government Buyer: - Hays County Purchasing Office, San Marcos, Texas - Project in coordination with Texas Department of Transportation (TxDOT) specifications - Products/Services Requested: - Removal of existing 6-inch pavement and replacement with 4 inches of Type B Hot Mix asphalt (5,410 square yards) - Installation of 2-inch Type D Hot Mix asphalt overlay (5,410 square yards) - Application of TRAIL tack coat prior to overlay and at pavement edges/manhole rings - Milling operations, including utility locates, repairs, trucking, and haul-off - Traffic control, safety operations, and post-paving cleanup - OEMs and Vendors: - No specific OEMs or vendors are named; bidders must comply with TxDOT 2024 specifications (Special Specifications 3076 for Type B and 3077 for Type D Hot Mix, Item 351 for pavement repair, and 3084 for bonding course) - Unique/Notable Requirements: - Strict compliance with TxDOT materials, construction, and quality control standards - Turn-key installation including all labor, equipment, and materials - Pricing based on actual square yards completed - Liquidated damages of $500 per day for late completion - Contractor responsible for traffic control, resident notification, and post-paving cleanup - Bonding and insurance required - Locations: - Work performed on Campo del Sol Parkway, Sunfield Subdivision, San Marcos, TX - Coordination with Hays County Transportation Department and Purchasing Office

Description

Hays County is soliciting bids through Invitation for Bid (IFB) 2026-B08 for the removal of existing 6 inches and replacement with 4 inches of Type B Hot Mix and 2 inches of Type D Hot Mix Overlay on Campo del Sol Parkway in the Sunfield Subdivision. The project involves asphaltic concrete removal and replacement on a specified roadway. Bids must be submitted by June 8, 2026, at 10:00 AM. The project is managed by Hays County, Texas.

View original listing