Opportunity

SAM #W912HN26BA009

Brunswick Harbor Modifications Project – Dredging and Expansion Services Solicitation

Buyer

Savannah District

Posted

May 15, 2026

Respond By

June 15, 2026

Identifier

W912HN26BA009

NAICS

237990

The US Army Corps of Engineers, Savannah District, is seeking contractors for the Brunswick Harbor Modifications Project in Georgia. - Government Buyer: - US Army Corps of Engineers, Savannah District (ENDIST SAVANNAH), Department of Defense, Department of the Army - Scope of Work: - Expansion of Cedar Hammock Range bend widener by up to 321 feet (north side), approximately 2,700 feet in length - Dredging to a depth of -38 feet - Removal of approximately 205,000 cubic yards of material, to be placed at a Beneficial Use site on Jekyll Island - Expansion of the turning basin at Colonel’s Island Terminal along 4,100 feet, increasing width by up to 395 feet - Dredging to a depth of -38 feet, with approximately 346,000 cubic yards of material to be placed at Andrew’s Island DMCA - Products/Services Requested: - Construction and dredging services for harbor expansion and material placement - Unique/Notable Requirements: - Precise dredging depths and material removal quantities - Designated placement sites for dredged material (Jekyll Island and Andrew’s Island DMCA) - No specific OEMs or equipment manufacturers are named, as this is a construction and dredging project - No product part numbers or quantities for equipment are specified

Description

The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel?s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew?s Island DMCA. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W912HN26BA009Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module

View original listing