Opportunity
West Sacramento Opengov #258188
West Sacramento City Hall Galleria Floor Refinishing with KOSTER Epoxy System (Rebid)
Posted
May 08, 2026
Respond By
May 26, 2026
Identifier
258188
NAICS
238330, 238390, 238190
This opportunity involves the refinishing of the Galleria floor at West Sacramento City Hall: - Government Buyer: - City of West Sacramento (local government) - Project location: 1110 West Capitol Avenue, City Hall - OEMs and Vendors: - KOSTER American Corp. (OEM for all flooring system products) - Products/Services Requested: - KOSTER VAP I 2000 (primer): Zero VOC moisture barrier for concrete floors - KOSTER MPE (epoxy body coat): Epoxy body coat for flooring system - KOSTER UTC (urethane topcoat): Clear urethane topcoat for flooring system - Flooring removal and surface preparation - Crack and joint repair using KOSTER repair materials - Installation of the KOSTER epoxy flooring system (including moisture barrier, epoxy base coats, urethane topcoat) - Cleanup and protection of finished floor - Unique/Notable Requirements: - Only KOSTER American Corp. products are permitted; no substitutions allowed - Flooring system must be durable, seamless, chemical-resistant, and provide a minimum 15-year service life - Moisture barrier must be installed by a trained applicator for a 15-year warranty - Bidders must submit product data sheets, finish samples, and proof of installer approval from KOSTER - Work must be performed within specified temperature and humidity ranges - Contractor must provide all necessary licenses, certifications, and warranties (including a minimum 1-year workmanship warranty) - Includes surface preparation, crack/joint repair, moisture mitigation, and final cleanup
Description
The City of West Sacramento is soliciting sealed bids for the concrete refinishing of the Galleria floor at City Hall. The project involves removing existing flooring and installing a new KOSTER epoxy flooring system with a moisture barrier, epoxy base coats, and a clear urethane topcoat across the lobby areas and hallways of the first, second, and third floors. The work includes surface preparation, moisture mitigation, application of durable flooring materials, and cleanup. The flooring system must provide a minimum service life of 15 years and be resistant to moisture-related damage, ensuring a high-quality finish suitable for high-traffic public environments.