University of Central Missouri Ionwave #26-083 Addendum 2
Pertle Springs Pond East Embankment Stabilization Project – University of Central Missouri
Posted
May 05, 2026
Respond By
May 20, 2026
Identifier
26-083 Addendum 2
NAICS
237990, 238910
This opportunity is for the stabilization and reinforcement of the east embankment at Pertle Springs Pond, located at the University of Central Missouri's Warrensburg campus. - Government Buyer: - University of Central Missouri - Facilities and Planning Office - Procurement Office - Project Scope: - Stabilize and reinforce the east embankment of Pertle Springs Pond to prevent erosion and protect the adjacent roadway - Site preparation, grading, and final cleanup - Installation of erosion-control geotextile fabric - Placement of 10–20 inch riprap stone - Installation of boulders as a safety barrier - Slope and retaining wall reinforcement - Drainage improvements - Products/Services Requested: - Rock and fiber materials for embankment stabilization (no specific part numbers) - Drainage improvement materials and installation - All labor, materials, equipment, permits, and site restoration - Unique/Notable Requirements: - Compliance with prevailing wage laws - Bid bond (5%) and performance/payment bonds (100%) required - Minimum one-year warranty on erosion control work - Adherence to UCM construction insurance and safety standards - Project is tax-exempt - Bids must be submitted via UCM Ebid system with electronic surety bonds - OEMs and Vendors: - No specific OEMs named; open to qualified construction vendors - Place of Performance: - Pertle Springs Pond and Pertle Springs Recreation Area, Warrensburg, MO - University of Central Missouri campus - Period of Performance: - Completion required within 20 calendar days from Notice to Proceed - Liquidated damages for late completion - Minimum one-year warranty on erosion control work
Description
This solicitation is an Invitation for Bid issued by the University of Central Missouri for the Pertle Springs Pond East Embankment Stabilization Project. The project involves stabilizing and reinforcing the east embankment of the Pertle Springs pond to prevent erosion, improve safety, and protect the adjacent roadway. Work includes site preparation, geotextile fabric installation, riprap installation, boulder placement as a safety barrier, slope and retaining reinforcement, erosion control and drainage improvements, final grading, and cleanup. Vendors are required to submit bids via the UCM Ebid system and are encouraged to attend a prebid meeting on May 13, 2026.