Opportunity

Tarrant County Ionwave #F2026123

Tarrant County Solicits Bids for Pyramid Boulevard Culvert Improvements in Fort Worth, TX

Posted

May 15, 2026

Respond By

June 11, 2026

Identifier

F2026123

NAICS

237310, 237990, 238110

Tarrant County Engineering Services is seeking bids for the Pyramid Boulevard Culvert Improvements project in Fort Worth, Texas. - Project Scope: - Replacement and upgrade of the existing culvert crossing at Pyramid Boulevard near Stroup Drive - Demolition of existing asphalt and reinforced concrete pipe (RCP) - Installation of an 8-cell, 6' x 1.5' cast-in-place reinforced concrete box culvert (RCB) with associated wingwalls and headwalls - Construction of concrete and stone riprap for slope protection and aprons - Roadway reconstruction including 10" flexible base, 2" HMAC Type D surface, and 4" HMAC Type B binder asphalt paving - Pavement striping using Type I thermoplastic materials - Installation and relocation of ground mounted aluminum sign and post assemblies - Traffic control measures including portable changeable message signs, flaggers, and lane maintenance - Erosion and sedimentation control, rock berms, stabilized construction exits, and vegetative watering - Site restoration with topsoil, block sodding, and final cleanup - Notable Requirements: - Compliance with Texas Department of Transportation (TXDOT) standards and specifications - Adherence to Davis-Bacon prevailing wage rates - Provision of payment, performance, and maintenance bonds - Compliance with Tarrant County's Historically Underutilized Business (HUB) policy - Open to qualified construction firms; no specific OEMs required - Quantities: - 320 linear feet of 6' x 1.5' RCB (CIP with Class S Top Slab) - 350 units of 10" flexible base - 40 units of 2" asphalt pavement (Type D) - 80 units of 4" asphalt pavement (Type B) - 25 units of 12" protection stone riprap - 500 units of block sodding for final stabilization - 28 portable changeable message signs - Buyer: - Tarrant County Engineering Services, with procurement managed by the Tarrant County Purchasing Office - Period of Performance: - Estimated substantial completion within 30 calendar days from notice to proceed

Description

This solicitation is an Invitation for Bid issued by Tarrant County for the Pyramid Boulevard Culvert Improvements project. The project involves the replacement and upgrade of the existing culvert crossing beneath Pyramid Boulevard near Stroup Drive, including selective demolition, culvert construction, roadway construction, traffic control, site restoration, and final cleanup. The work must comply with TXDOT standards and specifications, and the project is expected to be completed within 30 calendar days. Bidders are encouraged to attend a virtual pre-bid conference and download all bidding documents prior to submission.

View original listing