Opportunity

Utah Public Procurement Place U3P #26-134

Weber County 2550 North Drainage Project – Storm Drain and Roadway Improvements

Posted

May 14, 2026

Respond By

May 28, 2026

Identifier

26-134

NAICS

237110, 237990

Weber County, Utah is seeking qualified contractors for the 2550 North Drainage Project, which involves significant storm drain and roadway improvements. - Government Buyer: - Weber County, Utah (County Engineer's Office) - Products and Construction Materials Requested: - 235 linear feet of 15-inch reinforced concrete pipe (RCP) - 3 inlet boxes (with bicycle-safe grates and frames) - 1 junction box (with vehicle-safe grate and frame) - 1 combo box (with vehicle-safe frame and grate) - 2 connections to existing inlet boxes - 85 linear feet of existing pipe removal - 1 existing box removal - 160 tons of bedding rock - 320 tons of backfill - 300 tons of roadbase - 95 tons of asphalt patch - 40 linear feet of 30-inch curb and gutter replacement - 1 looped 6-inch PVC waterline (per Pineview Water Systems specs) - 10,200 square feet of asphalt rotomilling/removal - 400 tons of asphalt - Striping (paint and pavement markings per APWA and MUTCD standards) - 5 manhole and valve collar adjustments - Services and Work Scope: - Removal and disposal of existing storm drain pipe, boxes, and asphalt - Excavation, shoring, dewatering, and restoration - Installation of new drainage structures and connections - Roadway regrading, repaving, and striping - Coordination for waterline looping - Unique/Notable Requirements: - All work must comply with APWA Standards and Specifications - Coordination with Pineview Water Systems for waterline work - Liquidated damages of $100 per day for late completion - Project completion required by specified deadline, with final payment readiness within 30 days after substantial completion - No specific OEMs or proprietary products are named; the solicitation is open to qualified civil construction contractors.

Description

This solicitation is for the construction of the 2550 North Drainage Project in Weber County, Utah. The work includes removing existing storm drain pipe and concrete waterway, installing new storm drain pipe and structures, addressing utility conflicts, rotomilling existing asphalt, regrading and repaving the west leg of the intersection, and striping work. All work must comply with APWA Standards and Specifications. The project is estimated at $230,000 and bids will be received electronically by May 28, 2026.

View original listing