Opportunity

Dalton Civicplus #5

Dalton, GA Stormwater Bypass System Construction (North Glenwood Avenue)

Posted

April 16, 2026

Respond By

May 28, 2026

Identifier

5

NAICS

237110, 237310, 237990

The City of Dalton Public Works Department is seeking competitive proposals for the construction of the North Glenwood Avenue Bypass System, a major stormwater conveyance and civil infrastructure project in Dalton, Georgia. - Government Buyer: - City of Dalton Public Works Department (Finance Department) - Project Scope: - Construction of a stormwater bypass system from 631 Glenwood Avenue to 622 North Elm Street - Installation of stormwater assets: box culverts (6'x3', alternates), reinforced concrete pipe (RCP) in multiple sizes, catch basins (GDOT 1034D), drop inlets (GDOT 1019AP), headwalls (GDOT 1125), storm manholes (GDOT 1011A), and manufactured bends - Sanitary sewer and water service demolition, reconnection, and installation (including doghouse manholes, ductile iron pipe, PVC pipe) - Roadway and site restoration: heavy duty concrete pavement, gravel parking lot replacement, driveway and sidewalk repairs, curb and gutter replacement, thermoplastic road markings - Demolition and removal of existing pavement, pipes, and structures - Erosion and sediment control: silt fence, compost filter sock, turf grass seeding, riprap, dust control - Traffic control, utility conflict management, stormwater dewatering, and by-pass pumping - Grading, fine grading, and site clearing (including tree removal) - Products/Materials (selected quantities): - 6'x3' Box Culvert: 66 LF (base), 319 LF (alternate) - RCP: 18", 24", 30", 36", 42", 60", 72" (various quantities) - Catch Basins: 7 (GDOT 1034D), 1 custom - Drop Inlets: 4 (GDOT 1019AP), 2 custom - Headwalls: 2 (GDOT 1125), 1 custom - Storm Manholes: 6 (GDOT 1011A), 1 custom - Ductile Iron Pipe: 10" (348 LF), 8" (20 LF), 6" (60 LF) - Heavy Duty Concrete Pavement: 2,090 SY - Gravel Parking Lot Replacement: 1,500 SY - Services: - Traffic control, utility conflict resolution, sanitary sewer by-pass pumping, site grading, stormwater dewatering, vegetation clearing and grubbing - Notable Requirements: - Contractors must be GDOT prequalified with utility licenses - Night work required for Glenwood Avenue lane closures; weekend work by approval - Lump sum bid with unit price for overruns; alternate pricing for certain manufactured items - Compliance with Georgia Security and Immigration Compliance Act (affidavit required) - Mandatory pre-proposal meeting for plan holders - Proposals are numerically scored to encourage creative and problem-solving approaches - No specific OEMs or proprietary brands are named; the project is open to qualified civil contractors and suppliers.

Description

The City of Dalton is soliciting sealed competitive proposals for the construction of the North Glenwood Avenue Bypass System, a stormwater conveyance system extending from 631 Glenwood Avenue to 622 North Elm Street in Dalton, GA. The project scope includes installation of stormwater assets, utility adjustments, open trenching, demolition and replacement of asphalt and concrete, clearing and grubbing, traffic control, and site grading. Proposals must be detailed, comply with the Georgia Security and Immigration Compliance Act, and include a notarized affidavit of compliance. A mandatory pre-proposal meeting is scheduled for May 4, 2026, and proposals are due by May 21, 2026.

View original listing