Opportunity
City of Laredo Ionwave #FY23-ENG-18 Addendum 2
City of Laredo El Metro Transit Center Building Maintenance and HVAC Upgrade Project
Posted
April 19, 2026
Respond By
May 21, 2026
Identifier
FY23-ENG-18 Addendum 2
NAICS
238910, 238220, 238190, 238350
The City of Laredo is seeking bids for a comprehensive building maintenance and upgrade project at the El Metro Transit Center. - Government Buyer: - City of Laredo Engineering Department (primary), with involvement from Building Development Services, Purchasing, and City Secretary's Office - OEMs and Vendors (Highlighted): - PACE (air handling units) - Spirotherm (air/dirt separators) - Grundfos (pumps and hydronic specialties) - Elbi (expansion tanks) - Bosch-TempMaster (DX split systems) - Tutco/Warren (duct heaters) - Total Security Solutions (ballistic fiberglass) - ABB (variable frequency drives) - Products and Quantities: - Replacement of 5 chilled water air handling units (PACE or equivalent) - 2 chilled water pumps with VFDs (Grundfos or equivalent) - 1 20-ton DX split system (Bosch-TempMaster or equivalent) - Air/dirt separators (Spirotherm/Grundfos), expansion tanks (Elbi) - Duct heaters (Tutco/Warren) - Level 3 bullet-resistant fiberglass vestibule wall (Total Security Solutions or equal) - Laminated/tempered safety glass panels for canopy - New canopy steel frame and fabric - Electrical upgrades: VFDs (ABB), disconnects, panels, LED lighting, PA system - IT equipment allowance for data outlets, cabling, and UPS - Services Requested: - Masonry and façade repairs (crack repair, mortar restoration, brick replacement) - Concrete flatwork repairs - HVAC controls system (BAS/EMCS) installation and integration - Public address system installation - Temporary cooling services during HVAC downtime - Safety and pedestrian protection during construction - System flushing, cleaning, startup, and commissioning - Phased construction and outage management to maintain building operation - Unique/Notable Requirements: - Phased construction in an occupied, operational transit facility - Temporary cooling equipment required during HVAC outages - Strict safety and pedestrian protection measures - Compliance with City of Laredo codes, OSHA, federal labor standards, and Build America, Buy America Act for steel - Allowances for contingency ($125,000) and IT equipment ($50,000) - Mandatory supplier registration and electronic or hand-delivered bids with bid deposit - Locations: - El Metro Transit Center, 1319/1301 Farragut Street, Laredo, TX 78040/78045 (primary place of performance) - Greyhound Bus Station area (included in scope) - City Secretary's Office and Engineering Department at City Hall (contracting/government offices)
Description
The City of Laredo is soliciting bids for the El Metro Transit Center Building Maintenance Project, which includes general maintenance, selective demolition with temporary sidewalk barriers, exterior masonry veneer repairs on all floor levels, concrete flatwork, and replacement of HVAC air handler units, associated ductwork, chilled water lines, and control system wiring. The project also involves repairs to building masonry veneer, replacement of HVAC air handlers, chilled water lines, introduction of a new HVAC controls system, and a new public address system as per the plans and specifications prepared by Sepulveda Associates Architects, Inc. The construction contract time is 240 working days. Bidders are encouraged to submit bids electronically or hand-deliver sealed bids by the deadline.