Opportunity

Port Townsend Municode #1000-H

San Juan Avenue Rehabilitation Project – Construction Services and Materials

Posted

April 27, 2024

Respond By

May 27, 2026

Identifier

1000-H

NAICS

237310, 237990, 238910

This opportunity involves the rehabilitation of San Juan Avenue in Port Townsend, Washington, managed by the City of Port Townsend Public Works Department. - Government Buyer: - City of Port Townsend Public Works Department - Contracting office at Port Townsend City Hall, 250 Madison St, Suite 1, Port Townsend, WA 98368 - Scope of Work: - Roadway surveying, grading, and excavation - Pulverizing existing asphalt pavement and base material - Mixing and stabilizing pulverized material with cement to construct a cement-treated base (CTB) - Placing crushed surfacing top course - Additional grading for chip seal - Traffic control, including detours and lane closures - Utility adjustments and removal/replacement of water valve boxes - Final site cleanup - Products/Services Requested: - Major construction and civil engineering services (no specific OEMs or part numbers) - Key line items include: Full Depth Reclamation with CTB (42,184 sq ft), Pulverizing Existing Pavement (58,658 sq ft), Crushed Surfacing Top Course (250 tons), Cementitious Material (200 tons), Remove and Replace Valve Box (5 units) - Unique/Notable Requirements: - Compliance with 2026 WSDOT Standard Specifications - Completion required within 7 working days from Notice to Proceed - Adherence to prevailing wage laws and non-discrimination policies - 5% bid bond required; two-year correction period for nonconforming work - Emphasis on utility protection, dust control, and responsible bidder criteria - OEMs and Vendors: - No specific OEMs or named vendors; open to qualified construction contractors - Place of Performance: - San Juan Avenue from Lopez Avenue to Admiralty Avenue, City of Port Townsend, Jefferson County, WA - Contracting office at Port Townsend City Hall

Description

The City of Port Townsend is soliciting bids for the San Juan Avenue Rehabilitation Project. The scope of work includes traffic control, roadway surveying, pulverizing existing asphalt pavement and base material, mixing and stabilizing pulverized material with cement to construct a cement-treated base, roadway excavation, grading, shaping, compacting subgrade, placing crushed surfacing, additional grading for chip seal, protecting existing utilities, removing and replacing water valve boxes, and final site cleanup. All work must conform to the Contract Plans, Special Provisions, and Standard Specifications. The project must be physically complete within 7 working days from the Notice to Proceed.

View original listing