Opportunity
Jacksonville Beach Civicplus #2526-06
Lift Station 13 Rehabilitation and Site Upgrades for City of Jacksonville Beach
Posted
May 13, 2026
Identifier
2526-06
NAICS
237110, 237990
This opportunity involves the rehabilitation and site upgrades of Lift Station 13 (LS-13) for the City of Jacksonville Beach, Florida. - Government Buyer: - City of Jacksonville Beach (local government) - Products and Equipment Requested: - New pumps for a duplex lift station - 4-inch and 6-inch piping (including discharge and manifold for LS-16) - Valves and ancillary equipment - Pump control panel - Telemetry and SCADA equipment for remote monitoring and control - Site lighting - Hose bibb station and water service - Wet well specialty coating system - New concrete slab - New fencing for site security - Services Requested: - Temporary bypassing operations during construction - Demolition of existing equipment and structures - Site restoration, including repairs, cleanup, and replacement of damaged areas - Testing of installed systems and securing necessary permits - Erosion and sediment control per city standards - Dewatering operations, including preparation of a dewatering plan and securing permits - Notable Requirements: - Contractor must self-perform at least 30% of the contract work - Adherence to city standards for traffic maintenance, erosion and sediment control, and dewatering - Bidders must demonstrate qualifications, financial status, relevant experience, and provide references - No specific OEMs or vendors are named in the solicitation - All labor, equipment, tools, services, and incidentals must be provided by the contractor
Description
The project is located at the City of Jacksonville Beach and involves improvements at one City lift station, Lift Station 13 (LS-13), located on the east side of Fairway Lane. The scope includes rehabilitation of the existing duplex lift station with temporary bypassing operations, demolition of equipment and structures, installation of new pumps, piping, valves, pump control panel, telemetry and SCADA equipment, site lighting, new hose bibb station and water service, specialty coating system for the wet well, new concrete slab, fencing, and restoration. The contractor is responsible for all labor, equipment, tools, services, unloading, storing, installing, maintaining materials and equipment, repairs, testing, permits, cleanup, replacements, and restoration due to damages during construction. Bidders must demonstrate qualifications, financial status, experience, references, and the ability to perform at least 30% of the work with their own labor force.