Opportunity
Gwinnett County Bids #BL081-26
Gwinnett County Solicits Bids for Cannonwolde Drive 8-Inch Water Main Replacement
Posted
May 13, 2026
Respond By
June 16, 2026
Identifier
BL081-26
NAICS
237110, 237990
Gwinnett County Department of Water Resources is seeking pre-qualified contractors for the Cannonwolde Drive Water Main Replacement project: - Government Buyer: - Gwinnett County Board of Commissioners, Department of Water Resources, Purchasing Division - Project Scope: - Installation of approximately 4,550 linear feet of 8-inch ductile iron pipe (DIP) water main - Replacement of existing 8-inch PVC water distribution main - Includes installation of valves, fittings, hydrants, joint restraints - Reestablishment of service connections for affected properties - Restoration of curb, gutter, driveways, and asphalt pavement - Erosion and sedimentation control measures - Traffic control during construction - Products/Services Requested: - 8-inch ductile iron pipe (DIP) water main (approx. 4,550 linear feet) - Valves, fittings, hydrants, joint restraints (quantities as required) - Service reconnections and restoration services - Unique/Notable Requirements: - Only contractors pre-qualified for pressurized water mains (8 to <16 inches) may bid - Bidding documents must be obtained electronically from Tetra Tech - Mandatory virtual bid opening - OEMs and Vendors: - Ductile iron pipe and fittings are typically manufactured by companies such as U.S. Pipe, American Cast Iron Pipe Company (ACIPCO), and McWane Ductile - Tetra Tech is the engineering firm supporting the project - Period of Performance: - Substantial completion required within 300 days of contract start - Final payment eligible 30 days after substantial completion - Place of Performance: - Gwinnett County Department of Water Resources, 684 Winder Highway, Lawrenceville, GA 30045
Description
Gwinnett County is soliciting bids for the Cannonwolde Drive Water Main Replacement project. The work involves installing a new 8-inch DIP water main approximately 4,550 linear feet in length, including valves, fittings, hydrants, joint restraint, service connections, and restoration of affected areas. The project must be substantially complete within 300 days and final payment eligible 30 days after substantial completion. Bidders must be pre-qualified under the Annual Prequalification of Contractors for Pressurized Water Mains and submit sealed bids by June 29, 2026, with a virtual bid opening on the same day.