Opportunity

State Port Authority Alport #11781

Demolition and Removal of Ship Unloader Cranes at McDuffie Coal Terminal, Mobile, AL

Posted

April 15, 2026

Respond By

June 02, 2026

Identifier

11781

NAICS

238910

The Alabama Port Authority is seeking qualified contractors for the demolition and removal of ship unloader cranes at the McDuffie Coal Terminal in Mobile, Alabama. - Government Buyer: - Alabama Port Authority, Engineering Department - Scope of Work: - Base bid: Demolition and removal of the S Ship Unloader Crane at Dock 1 - Additive alternates: Optional removal of the M and Z Ship Unloader Cranes at Dock 3 - Includes removal of all ancillary parts and equipment from APA property - Contractors must provide all engineering, planning, equipment, materials, labor, bonds, and insurance - Submission of a conceptual removal plan, feasibility study, and detailed engineering report is required - Notable Requirements: - Strict adherence to hazardous materials handling (lead-based paint confirmed, no asbestos detected in accessible areas) - Compliance with Alabama General Contractor licensing - Coordination with ongoing port operations and safety/environmental protection - Mandatory 30-day exclusive access period to Dock 1 for S Crane removal - Project completion required within 90 calendar days from mobilization - Two-year guarantee period from final acceptance - No specific OEMs are named for the cranes; reference drawings and hazardous materials surveys are provided - Evaluation criteria include technical approach and schedule, not just lowest price

Description

The Alabama Port Authority (APA) is soliciting sealed proposals from qualified contractors for the engineering, planning, equipment, materials, and labor required to demolish and dispose of ship unloader cranes at the McDuffie Coal Terminal. The base bid covers demolition of the S Ship Unloader Crane located at Dock 1, with additive alternate proposals for the M and Z Ship Unloader Cranes at Dock 3. The project requires removal of cranes and ancillary equipment from APA property within 90 calendar days, with a mandatory 30-day exclusive access period to Dock 1 for the S Crane removal. Proposals will be evaluated based on criteria beyond lowest bid, and contractors must submit a conceptual removal plan and detailed schedule.

View original listing