Opportunity

Norcross Civicplus #ITB PW 26-08

City of Norcross 2026 Road Resurfacing Project – Construction Services Solicitation

Posted

May 11, 2026

Respond By

June 10, 2026

Identifier

ITB PW 26-08

NAICS

237310, 237990

The City of Norcross Department of Public Works is seeking bids for its 2026 Road Resurfacing Project, covering major roadwork across 19 city streets. - Government Buyer: - City of Norcross, Department of Public Works, Procurement & Capital Projects Manager - Products and Services Requested: - Milling of existing pavement (1.5 inch depth, 72,000 sq yd) - Patching with 19mm Superpave asphalt (3 inch depth, 3,213 tons) - Inlay asphalt for commercial (12.5mm Superpave, 2,008 tons) and residential streets (9.5mm Superpave, 3,633 tons) - Full depth reclamation milling (6 inch depth, 6,032 sq yd) and 10 inch soil cement stabilization (6,032 sq yd) for Bolton Circle - Additional asphalt layers (25mm and 19mm Superpave, 676 tons each) - Thermoplastic pavement markings: stop bars (29), crosswalks (11), directional arrows (23), school zone lettering (2), parking spaces (34) - Manhole (94) and valve (6) adjustments - Striping (8,000 linear feet), crack sealing (5.4 centerline miles), speed tables (2), traffic loops (4) - Mobilization and traffic control (lump sum) - Notable Requirements: - Contractors must provide all materials, labor, and equipment - Compliance with detailed technical specifications, insurance, and safety standards - E-Verify affidavits and adherence to Georgia immigration and public benefit laws - Liquidated damages of $300 per day for delays beyond 90 days - No specific OEMs or named vendors are specified, as this is a construction services solicitation - All work must be completed within 120 days from Notice to Proceed, with work commencing within 10 days and substantial completion required within 90 days

Description

The City of Norcross is soliciting sealed competitive bids from qualified contractors for a road resurfacing project as part of the city's 2026 road resurfacing program. The project includes milling and resurfacing 19 roads within city limits, repairing pavement base where needed, resurfacing adjacent driveways, adjusting water valves and manholes, and installing pavement striping and markings. All work must be completed within 120 days from the Notice to Proceed and comply with industry standards. Bids must be submitted by June 10, 2026, with an optional pre-bid meeting on May 27, 2026.

View original listing