Opportunity
Virginia Franklin Civic Plus #06022026-1400
Whole Building Diesel Generator System Installation for Benjamin Franklin Middle School West
Posted
May 11, 2026
Respond By
June 02, 2026
Identifier
06022026-1400
NAICS
238210, 238220
Franklin County Public Schools is seeking bids for the installation of a Whole Building Generator System at Benjamin Franklin Middle School West in Rocky Mount, Virginia. - Government Buyer: - Franklin County Public Schools, with procurement managed by the Franklin County Finance Office - OEMs and Vendors: - Woodward (referenced for DTSC 200A controller) - No other specific OEMs named; generator manufacturer is not specified - Products/Services Requested: - 1,000 KVA (1000 kW) diesel generator, 480V 3-phase - Generator enclosure and weatherproofing - 3,000-gallon diesel belly tank and fuel polisher - Concrete pad for generator installation - Panelboard, receptacle, generator lights, and labeling - Woodward DTSC 200A controller for automatic transfer switch (ATS) conversion - ATS conversion components: relays, voltage transformers, test switches, breakers, and wiring - 208V-3-80A and 120V-1-20A breakers for existing panels - Ground rod and grounding system integrated with building - Feeder and branch circuits, conduits, interconnections, and control equipment - Grading, seeding, site restoration, and diesel fuel supply - Complete installation, setup, and testing of all systems - Unique or Notable Requirements: - Upgrade of existing manual transfer switchgear to automatic operation using Woodward controller - Integration with fire alarm and DDC systems - Mandatory pre-bid conference and site visit - Bidders must be licensed Virginia Class A contractors - Bid bond of at least 5% required - Lump sum contract with defined completion milestones - Place of Performance: - Benjamin Franklin Middle School West, 225 Middle School Rd, Rocky Mount, VA 24151 - Contracting office: Franklin County Finance Office, 1255 Franklin Street, Suite 111, Rocky Mount, VA 24151
Description
This project involves the installation of a Whole Building Generator System at Benjamin Franklin Middle School West. The system includes a 1,000 KVA Diesel Generator, enclosure, lights, panelboard, receptacle, belly tank, fuel polisher, and a control kit to upgrade the existing manual transfer switchgear to an automatic unit. The work also includes installation of a concrete pad, feeder and branch circuits, conduits, grounding, interconnections, control equipment, grading, seeding, diesel fuel provision, and testing. The contractor is responsible for all interconnections, equipment mounting, wiring, and setup.