Opportunity
PIEE #W9128F26SM017
Construction of New Varsity Baseball Stadium at USAF Academy, Colorado
Buyer
USACE Northwestern Division Endist Omaha
Posted
May 12, 2026
Respond By
June 12, 2026
Identifier
W9128F26SM017
NAICS
237310, 238110, 238190, 237990
The U.S. Army Corps of Engineers, Omaha District, is seeking qualified firms for the construction of a new varsity baseball stadium at Erdle Field, United States Air Force Academy (USAF Academy), Colorado. - Government Buyer: - U.S. Army Corps of Engineers, Omaha District - Project Scope: - Demolition of existing press box and dugouts - Construction of new concrete grandstands, press box, restrooms, concessions, dugouts, and home team facilities - Home team facilities include locker rooms, showers, restrooms, replay booth, lounge, satellite sports medicine training room, and equipment mud room - Site improvements, utilities, new access road for maintenance/emergency vehicles, and parking - Construction methods: concrete slab on grade, seat risers, concrete retaining walls, structural steel framing with steel roof deck, exterior masonry load-bearing walls, concrete foundations, columns, and roof structures - Compliance with Department of Defense Unified Facilities Criteria (UFC) and antiterrorism/force protection requirements - Estimated Project Value: - Between $10 million and $17 million - Prime contractors must have bonding capability of at least $16 million - Period of Performance: - 480 calendar days from Notice to Proceed - No specific OEMs or vendors are named in the solicitation - Notable Requirements: - Project is open to both small and other than small business firms - Work must be performed at the USAF Academy, Colorado Springs, CO
Description
This project will consist of construction on a new baseball stadium at Erdle Field, at The USAF Academy, to create a functional and accessible modern stadium to meet NCAA baseball stadium requirements associated with intercollegiate operations. The existing Press Box and Dugouts will be eliminated to build new concrete grandstands, press box, restrooms, concessions, dugouts, and home team facilities. The home team facilities include a new locker room, showers and restroom for the USAFA baseball team, a replay booth, and a lounge space, a new locker room for the USAFA baseball coaching staff with showers and restrooms, a satellite sports medicine training room, and an equipment mud room attached to the first base dugout. Construction will consist of concrete slab on grade and seat risers on grade, concrete retaining walls, structural steel framing with steel roof deck, exterior masonry load-bearing walls, concrete foundations, and concrete columns and roof structures. Scope also includes demolition of the 1,000 SF press box and dugouts. Total building area to be reconstructed is about 10,000 SF. Limited work will be done on the existing baseball field. Construction of a new access road entering the site from the east roadway will provide maintenance and emergency vehicle access to playing field level. Please see the attached document for full details.