Opportunity
Los Angeles County Lacounty #RFB-IS-26200945
Roof Replacement at Fire Camp 8 Administration Building, Malibu, CA
Posted
May 11, 2026
Respond By
May 26, 2026
Identifier
RFB-IS-26200945
NAICS
238160
This opportunity involves the removal and replacement of the roof at the Fire Camp 8 Administration Building in Malibu, CA, for the Los Angeles County Internal Services Department and Fire Department. - Government Buyer: - County of Los Angeles Internal Services Department (ISD) - County of Los Angeles Fire Department, Fire Camp 8 Administration - Project Scope: - Complete removal of existing roofing down to the decking - Installation of an SBS type torch down roofing system or equivalent - Includes insulation, vapor barrier, overlay board, three-ply base sheet, and fiberglass reinforced cap sheet - New flashing throughout, resealing of ducting and roof equipment - Installation of pressure-treated wood sleepers for conduits and equipment - Estimated 800 sq ft of roof decking replacement (total roof area approx. 5,345 sq ft) - Daily clean-up and debris removal required - Product and Service Line Items: - SBS type torch down roofing system or equivalent (1 system) - Roof decking replacement (approx. 800 sq ft) - Flashing and pressure-treated wood sleepers - Labor, materials, transportation, and miscellaneous charges - Roof removal and installation services - Requirements: - Mandatory job walk at Fire Camp 8 Administration Building - Valid California C-39 Roofing Contractor or B General Building Contractor license required - Compliance with California Title 24, prevailing wage laws, and Los Angeles County Fire Department specifications - Minimum 20-year materials warranty and 5-year labor warranty - Liquidated damages for late delivery ($25 per calendar day per unit) - Locations: - Place of performance: Fire Camp 8 Administration Building, 1900 Rambla Pacifico, Malibu, CA 90265 - Delivery location: FS #21 BN18, 4312 W 147th St, Lawndale, CA 90260 - OEMs and Vendors: - No specific OEMs or vendors are named; SBS roofing system must meet or exceed specified standards - Notable Requirements: - All work must comply with applicable codes and regulations - Project duration is 10 working days during normal business hours
Description
This solicitation is for the removal and replacement of the admin building roof at Fire Camp 8. The project includes removing existing roofing down to the decking, inspecting and repairing roof decking, installing insulation, vapor barrier, overlay board, and a three-ply base sheet and fiberglass reinforced cap sheet SBS roofing system or equivalent. The contractor is responsible for obtaining all necessary permits and ensuring compliance with Los Angeles County Fire Department specifications and applicable codes. A mandatory job walk is scheduled, and bidders must have appropriate contractor licenses and comply with prevailing wage laws.