Opportunity

BidNet Direct #RFP2600164

Timnath Parkway North Connection Roadway and Infrastructure Construction

Posted

May 11, 2026

Respond By

May 29, 2026

Identifier

RFP2600164

NAICS

237310, 237990, 237110

The Town of Timnath, Colorado is seeking qualified contractors for the construction of the Timnath Parkway North Connection, a major infrastructure project to improve roadway connectivity and support future development. - Government Buyer: - Town of Timnath, Colorado (Procurement Specialist and Engineering Department) - OEMs and Vendors Mentioned: - Rain Bird (irrigation controllers, valves, and bubblers) - NIBCO (isolation gate valves) - FEBCO (backflow prevention assemblies) - Strongbox (enclosures for backflow prevention) - Mountain States Lighting (street lighting poles and fixtures) - Square D, GE, Eaton Cutler Hammer, Siemens (electrical equipment) - ADS (high performance stormwater pipe and end sections) - Nyloplast (drain basins) - Products and Services Requested: - Construction of a new two-lane roadway and single-lane roundabout, including: - Earthwork, excavation, and grading - Hot mix asphalt paving (various grades and thicknesses) - Concrete sidewalks, curbs, ramps, medians, and hardscape - Storm sewer and drainage systems (reinforced concrete pipe, box culverts, inlets, manholes, riprap) - Utility relocations and coordination (water, gas, electric, fiber optic, sanitary and storm sewer) - Traffic control operations, signage, striping, and pavement markings - Landscaping (deciduous and ornamental trees, shrubs, boulders, mulch, irrigation systems) - Street lighting (28-foot steel poles with LED fixtures) - Decorative monument signage and architectural features - Erosion and sediment control, seeding, mulching - Construction surveying and mobilization - Notable part numbers and models: - Rain Bird 5LRC, RWS-M-B-C-1401, NIBCO T113K, FEBCO 825YA, Strongbox SBBC, Mountain States Lighting 28RTS-8/4-SA/2B/6'S/SCR ARM-22MAD(LOGO)-BK-K819LED - Unique or Notable Requirements: - Coordination with multiple utility providers (Xcel Energy, Magellan Pipeline, Fort Collins Loveland Water District, CenturyLink, etc.) - Two-year warranty for public improvements and one-year warranty for electrical installations - Liquidated damages of $1,000 per day for project delays - Compliance with Town of Timnath standards, CDOT criteria for concrete, and environmental/erosion control standards - Phased construction with comprehensive traffic management and restoration - Detailed documentation of team qualifications, project schedule, and pricing - Electronic bid submission and provision of bid, performance, and payment bonds

Description

The Town of Timnath is soliciting proposals from qualified contractors for the construction of the Timnath Parkway North Connection, which involves building a new two-lane roadway and roundabout with a landscaped median and sidewalks. The project aims to improve safety and comfort for drivers, pedestrians, and cyclists, enhance mobility, support future development, and establish a northern gateway to Old Town Timnath. The work includes earthwork, construction of a single-lane roundabout, HMA roadway, pedestrian and bicycle infrastructure, storm sewer improvements, concrete boxes, landscaping, utility relocation coordination, signage, striping, and traffic control operations. The project site is located at the intersection of E Buss Grove Road and S Main Street, connecting to Timnath Parkway in Timnath, Colorado.

View original listing