Opportunity
BidNet Direct #0000423620
Atlantic City Solicits Replacement and Installation of Two Barrier Gate Operators
Posted
May 08, 2026
Respond By
May 12, 2026
Identifier
0000423620
NAICS
238210, 238290
The City of Atlantic City is seeking quotes for the replacement and installation of two commercial-grade barrier gate operators at its municipal complex. - Government Buyer: - City of Atlantic City, Purchasing Department - Products and Equipment Requested: - Two commercial-grade barrier gate operators to replace failed units - Each gate must include: - External up/normal/down key switch with two keys - Bottom-mounted LED arm lighting (red/green/blue capability, visible from both sides) - Controller-integrated light operation - Required low-voltage power supply - All necessary controllers, motors, power supply components, and related operating hardware - Services Required: - Removal of failed equipment - Installation, setup, and comprehensive testing of new barrier gate operators - Verification of site conditions and confirmation of existing power/control wiring - Restoration of full gate operation, including movement, safety controls, key switch, and lighting - Shipping, handling, travel, and all applicable service charges - Unique/Notable Requirements: - Contractor must install equipment per manufacturer requirements - All work must ensure full restoration of gate operation and safety features - No specific OEMs or vendors are named; commercial-grade quality is required - Location: - Work to be performed at the City of Atlantic City municipal complex
Description
This solicitation is a Request for Quote (RFQ) for furnishing and installing two replacement barrier gate operators at designated facility entrance/exit locations in Atlantic City, New Jersey. The work includes removal and replacement of existing failed barrier gate equipment such as controllers, motors, power supply components, and related hardware. Each barrier gate must include commercial-grade operators, key switches, LED arm lighting with multiple colors, integrated light operation, low-voltage power supply, installation labor, setup, testing, and all associated charges. The contractor must verify site conditions, confirm wiring, install equipment per manufacturer requirements, and restore gates to proper operating condition with full testing.