South Tahoe Public Utility District PlanetBids #2026 Pioneer Trail Waterline Project (REBID)
STPUD 2026 Pioneer Trail Waterline Project: Major Waterline and Infrastructure Installation (REBID)
Posted
May 07, 2026
Respond By
June 09, 2026
Identifier
2026 Pioneer Trail Waterline Project (REBID)
NAICS
237110, 237990
The South Tahoe Public Utility District (STPUD) is seeking bids for the 2026 Pioneer Trail Waterline Project (REBID) in South Lake Tahoe, California. - Project Scope: - Installation of approximately 8,700 to 11,300 linear feet of 16-inch diameter ductile iron waterline pipe - Additional 500 linear feet of 12-inch and 8-inch diameter pipe - Construction of three pressure reducing valve stations and three pressure regulating valve stations - Installation of 9 to 13 fire hydrants and completion of five interties - Paving of approximately 48,000 square feet, trench patching, and mill/overlay - Temporary traffic control, stormwater pollution prevention, and erosion control measures - Specialized services including groundwater dewatering, tree removal, surveying, and cultural/wildlife resource monitoring - Notable Requirements: - Compliance with federal and state labor standards, including prevailing wage and Disadvantaged Business Enterprise (DBE) participation - Adherence to American Iron and Steel (AIS) requirements - Environmental compliance: Stormwater Pollution Prevention Plan (SWPPP), invasive species management, wildlife and cultural resource monitoring - Valid California Class A Contractor License required - Project funded by EPA Community Grants, USDA Forest Service (Lake Tahoe Restoration Act), and California Drinking Water State Revolving Fund Loan - Work to be performed within El Dorado County right-of-way and on US Forest Service lands under a special use permit - No specific OEMs or proprietary products are named; the solicitation is open to qualified contractors able to meet technical, environmental, and compliance criteria.
Description
This solicitation is for the construction of the 2026 Pioneer Trail Waterline Project, involving the installation of approximately 8700 linear feet of 16-inch diameter Class 250 ductile iron waterline pipe, plus an additional 500 linear feet of 12-inch and 8-inch diameter pipe. The project includes three pressure reducing valve stations, 13 hydrants, completion of five interties, 48,000 square feet of paving, temporary traffic control, and compliance with stormwater pollution prevention plans. The work requires a valid Class A Contractor License and adherence to state and federal regulations including DBE and AIS requirements. Bids must be submitted electronically by June 9, 2026, with a mandatory pre-bid meeting on May 20, 2026.