Opportunity
City of Moline Ionwave #1514
City of Moline 11th Avenue C Roadway and Utility Reconstruction Solicitation
Posted
May 10, 2026
Respond By
May 26, 2026
Identifier
1514
NAICS
237310, 237110, 237990
The City of Moline Engineering Department is seeking bids for the full reconstruction of 11th Avenue C between 32nd and 33rd Streets, covering roadway, utility, and sidewalk upgrades. - Government Buyer: - City of Moline, Engineering Department (local government) - Scope of Work: - Complete concrete roadway reconstruction - Replacement and installation of water main (6", 8", 10"), sanitary sewer (8", 12"), and storm sewer (12", 15") - Sidewalk and driveway pavement installation and removal - Installation of retaining walls, landscaping (sodding, trees, mulch, rock), and seeding - Traffic control, site grading, and erosion control - Utility coordination, testing, and disinfection services - Demolition and removal of outdated infrastructure (pavement, manholes, inlets, valves, hydrants) - Products & Quantities (selected major items): - PCC pavement with integral curb: 1,712.9 sq yd - PCC sidewalk: 2,535.3 sq ft; sidewalk ramp: 443.2 sq ft - Water main (8"): 488.3 ft; sanitary sewer (8"): 472 ft; storm sewer (15"): 278.9 ft - Fire hydrant assemblies: 2; valves and valve boxes: multiple sizes - Segmental block retaining wall: 145 sq ft - Temporary cluster mailbox: 1 - Geotechnical fabric: 1,901.5 sq yd - Services: - Site grading, traffic control setup, landscaping restoration, construction inspection, utility installation, pavement marking, demolition, concrete pouring, hydraulic testing, utility coordination, site cleanup, erosion control, public notification, quality assurance testing, and more - Notable Requirements: - Compliance with Illinois Prevailing Wage Act and Clean Construction or Demolition Debris (CCDD) regulations - Electronic bid submission via IONWAVE - Performance and payment bonds required - Adherence to City of Moline Supplemental Specifications and Illinois DOT standards - Project must be completed within 70 working days, with all work finished by the end of the year - No specific OEMs or proprietary products are named; standard construction materials and components are specified - Place of Performance: - 11th Avenue C, from 32nd to 33rd Streets, Moline, IL - Contracting office: 3635 4th Avenue, Moline, IL 61265
Description
The City of Moline is seeking bids for Job Number 1514 - 11th Avenue C Reconstruction, located from 32nd to 33rd Street. The work involves concrete reconstruction of 11th Avenue C, replacement of water main, sanitary sewer, and storm sewer, sidewalk installation, seeding, traffic control, and related work. The contractor is required to complete the project within 70 working days, with all work finished by the end of 2026. Prevailing wages as per 820 ILCS 130/1 are required for this project, and bidding will be conducted electronically through the IONWAVE website.