Opportunity
Alberta Purchasing #AB-2026-03658
Infrastructure Installation for 91 Avenue Connector in Lac La Biche County
Posted
May 08, 2026
Respond By
May 29, 2026
Identifier
AB-2026-03658
NAICS
237310, 237990
Lac La Biche County is seeking bids for the installation of the 91 Avenue Connector infrastructure, connecting Beaverhill Road to 93 Street. - Scope includes removal and disposal of existing sanitary sewer, watermain, storm sewer, concrete walkways, asphalt, and curb & gutters - New installations required: - 198m PVC DR35 sanitary sewer (300mm diameter) - 203m Ultra Rib storm sewer (525mm diameter) - 262m C-900 PVC DR18 watermain (300mm diameter) - 6 sulfate-resistant manholes (1200mm diameter) - 5 NF-80 manhole frames and covers - 4 gate valves (300mm) with valve boxes - 3 fire hydrants, valves, and leads - 3 flush points (50mm) with plugs - 12 Cobra Head street lights - 618m concrete walkway (1.5m wide) - 832m concrete curb and gutter - 5,000m2 topsoil, 2,000m2 seeding, 3,000m2 sod - Services include general requirements, mobilization, survey layout, excavation, ditch construction, tie-ins, maintaining uninterrupted sanitary, stormwater, and water services, and restoring private access - Contractors must ensure continuous access and utility services for residents throughout construction - Procurement governed by NWPTA, CFTA, TCA, and CETA trade agreements - No specific OEMs or vendors are named in the solicitation - Delivery and performance at Lac La Biche County, Alberta, Canada
Description
This solicitation is an invitation to bid for the infrastructure installation of the 91 Avenue Connector in Lac La Biche County, covering the area from Beaverhill Road to 93 Street. The project includes extensive work such as removal and disposal of existing sanitary sewer, watermain, storm sewer, concrete walkways, asphalt, and curb & gutters. It also involves supply and installation of new sanitary sewer, manholes, storm sewer, watermain, valves, fire hydrants, paving, street lights, concrete walkways, and landscaping. The work requires maintaining uninterrupted services to residents throughout construction and is scheduled for delivery from June 19, 2026, to October 30, 2026.