Opportunity
Brazos Valley Ionwave #018-07-26 Addendum 4
Reconstruction of Shady Lane Substation for Bryan Texas Utilities
Posted
April 15, 2026
Respond By
June 02, 2026
Identifier
018-07-26 Addendum 4
NAICS
237130, 237990
Bryan Texas Utilities (BTU) is seeking bids for the comprehensive reconstruction of the Shady Lane Substation in College Station, Texas. - Project scope includes: - Demolition of existing substation structures and equipment - Installation of new steel monopoles for 69kV transmission - Replacement of 795 ACSR "Drake" conductors and 3/8" EHS steel shield wire - Construction of underground duct banks and conduit systems - Installation of substation control and protection equipment (panels, relays, automation) - Concrete foundations and slabs for equipment and duct banks - Full site restoration and environmental protection measures - Engineering design provided by Burns & McDonnell - Contractor must coordinate with existing utilities and adhere to BTU and City of College Station specifications - Mandatory pre-bid meeting and site visit required - No specific OEMs for major equipment are named in the solicitation - Emphasis on safety, environmental compliance, and restoration of disturbed areas
Description
This solicitation is a request for bid issued by Bryan Texas Utilities for the reconstruction of the Shady Lane Substation located in College Station, Texas. The project includes demolition of existing features, installation of new electrical equipment, underground duct banks, conduit installation, and civil site work. A mandatory pre-bid meeting and site visit is scheduled for April 28, 2026, with electronic bids due by June 2, 2026. The work involves coordination with existing utilities and adherence to safety and environmental standards.