Opportunity
South Coast Water District Planet bids #26-0009
SCWD Pump Station 6 Improvements: Major Mechanical, Electrical, and Controls Upgrade
Posted
May 07, 2026
Respond By
June 05, 2026
Identifier
26-0009
NAICS
237110, 238210, 238290, 238220
South Coast Water District (SCWD) in Orange County, California, is seeking contractors for major improvements to Pump Station 6 (PS6): - Buyer: South Coast Water District, Engineering Department - Project scope includes: - Removal and replacement of pump station interior suction/discharge piping, valves, meters, and pressure instruments - Upgrades to electrical, instrumentation, telemetry, and control systems - Demolition of existing equipment and installation of new hardware - Environmental and safety compliance (asbestos abatement, stormwater prevention) - Key OEMs and products specified: - Schneider Electric: M580 PLC, X80 modules (BME NOC 0301, BME P58 1020, BMX AMI 0810, BMX AMO 0410, BMX CPS 3020, BMX DDI 1602, BMX DDO 1602, BMX FTB 2010, BMX FTB 2800), XB4 selector switch, PK18GTA ground bar kit - Automation Direct: C-MORE HMI (EA9-T10CL) - AJC: UPS Battery (AJC-D12S) - Endress+Hauser: PROMAG W-400 magnetic flow meters (12" and 16") - CLA-VAL: Model 60-11 pump control valve - Mueller: B-3211 butterfly valves - Romac Industries: Style RFCA coupling adapter - Smith Blair: Model 914 reducing coupling adapter - Rosemount: Model 2088 pressure transmitter - Prosense: MPS25 pressure switch - Additional hardware from Phoenix Contact, Eaton, CBI, Banner Engineering, Leviton, and others - Notable requirements: - Strict adherence to specified OEMs for critical components (some items marked "NO EQUAL") - Mandatory electronic bid submission and hard copy bid bond - Mandatory pre-bid meeting attendance - Detailed technical and environmental compliance - Estimated contract value: $1,250,000 - Project duration: 120 working days (approx. 6 months) - Primary locations: SCWD Pump Station 6 Facility (Dana Point), SCWD Engineering Department (Laguna Beach), and related sites
Description
This solicitation is for the Pump Station 6 (PS6) Improvements project. The scope includes removing and replacing existing pump station interior suction and discharge piping, valves, meters, pressure instruments, and all ancillary features. Electrical system and instrumentation, telemetry, and control system improvements are also part of the project. The estimated contract value is $1,250,000 with an estimated completion date of March 1, 2027. A mandatory pre-bid meeting is scheduled for May 19, 2026, at 11:00 AM.