Opportunity
PIEE #W50S6T26BA019
HVAC System Replacement for Building 122 at Fresno Air National Guard Base
Buyer
W7MX USPFO ACTIVITY CAANG 144
Posted
May 08, 2026
Respond By
May 22, 2026
Identifier
W50S6T26BA019
NAICS
238220
The California Air National Guard's 144th Fighter Wing at Fresno Air National Guard Base is seeking a contractor to replace the HVAC system in Building 122. - Scope of Work: - Remove four existing HVAC units, including all associated ducting, electrical, and drain lines - Install four new 40-ton HVAC units with environmentally friendly refrigerants - Provide all necessary ducting, electrical, drain lines, and custom-made roof adapters - Ensure no new building penetrations; use only existing ones to maintain security per ICD 705 - Comply with Unified Facilities Criteria (UFC) 3-410-01 and all applicable environmental and safety standards - Provide a 10-year warranty on equipment and 3-year warranty on installation - Complete all work within a 90-day period of performance - Requirements: - Bid guarantee and Material Safety Data Sheet (MSDS) required with offer - Deliverables include project schedules, safety plans, and warranty letters - All work must be coordinated to avoid disruption and maintain facility security - No specific OEMs or part numbers are specified; the solicitation is open to qualified HVAC manufacturers and contractors - The opportunity is set aside 100% for small businesses
Description
The 144th Fighter Wing at Fresno Air National Guard Base (ANGB) intends to award a single firm-fixed-price contract for non-personal construction services, to include all plant, labor, transportation, materials, tools, equipment, permits, and supervision necessary to remove four existing Heating, Ventilation, and Air Conditioning (HVAC) units and their auxiliary air ducting and electrical and drain lines. After all existing HVAC units have been removed, the contractor shall install a new 40-ton HVAC system, necessary ducting, electrical, and drain lines to provide for the following training equipment environmental constraints - Operating Temperature: 59 to 78 F, (15 to 26 C), Operating Humidity: 35% to 80% RH (non-condensing), Storage Temperature: 32 to 120 F, (-29 to 38 C), Storage Humidity: 20% to 80% RH (non-condensing). Services shall also include the removal and replacement of existing dust covers with custom-made roof adapters to transition from current ductwork in room serviced by the new packaged units. In order to maintain the existing security integrity of the building and comply with Intelligence Community Directive (ICD) Number 705, no new penetrations in the building are permitted. The Contractor must use existing penetrations to the maximum extent practicable. All work must also conform to Unified Facilities Criteria (UFC) 3-410-01. Site visit details are located at Section L - Instructions, Conditions, Notices to Offerors or Quoters on the SF 1442. A bid guarantee is required in accordance with provision 52.228-1 on the SF 1442.