Opportunity
Citrus College Planet bids #05-2526
Campuswide Roofing Tear-off and Replacement for Citrus College
Posted
April 28, 2026
Respond By
June 04, 2026
Identifier
05-2526
NAICS
238160
Citrus Community College District is seeking bids for a comprehensive campuswide roofing tear-off and replacement project at its Glendora, California campus. - Government Buyer: - Citrus Community College District, Business Services Office - Scope of Work: - Removal of existing roofing and installation of new roofing systems for multiple buildings: - Field House (FH) - Gate House (GH) - Math Building (MA) - Adaptive PE Building (ADP) - Specific repairs include: - Foam roof repairs for the Math Building (removal of defective foam, installation of new polyurethane foam roofing, insulation, and roof coating compliant with ASTM standards) - Installation of new flashings for chiller lines on the Math Building - Rooftop building identification lettering across campus using acrylic coatings and provided stencils - Waterproofing, flashing, and detail work for the Adaptive PE Building - Product and Material Requirements: - Two-component polyurethane foam roofing (3.0 lbs/ft³ density, 45-50 psi compressive strength, ASTM C-1029-02 compliant) - Polyisocyanurate insulation boards (ASTM C1289, Type II, Class 1, Grade 2) - Title 24 compliant roof coating and granules - Acrylic mastic and reinforcement for watertight perimeter sealing - Neoprene primer for foam surfaces - Contractor Requirements: - Valid California C-39 Contractor’s license and DIR registration - Demonstrated experience with at least five large-scale (50,000+ sq ft) foam roofing projects, including three older than five years with references - Compliance with prevailing wage laws, insurance, bonding, and DVBE participation - Submittal of bid bond, non-collusion affidavit, and Iran Contracting Act certification - Warranty: - 2-year leak-free warranty for foam roof repairs - Schedule: - Substantial completion required within 90 days of Notice to Proceed; liquidated damages for delays - OEMs and Vendors: - No specific OEMs named; bidders must be authorized installers for roofing systems and provide manufacturer confirmation and crew training documentation - Locations: - All work to be performed at Citrus College, 1000 West Foothill Blvd, Glendora, CA 91741, including specific buildings as listed above
Description
This solicitation is for the tear-off and replacement of campuswide roofing at Citrus College, including specific repairs to various buildings such as the Field House, Gate House, Math Building, and Adaptive PE Building. The project requires contractors to have a valid California C-39 Contractor's license and registration with the Department of Industrial Relations. The scope includes removal of existing roofing materials, installation of new roofing systems, and related repairs as detailed in the bid documents and exhibits. Bids must be submitted electronically by June 4, 2026, with a pre-bid meeting scheduled for May 6, 2026.