Opportunity

CanadaBuys #20144031

Water Tower Replacement at École Polyvalente de l'Érablière, Gatineau, Québec

Posted

May 07, 2026

Respond By

June 04, 2026

Identifier

20144031

NAICS

237110

This opportunity involves the replacement of the water tower at École Polyvalente de l'Érablière in Gatineau, Québec, managed by the Centre de services scolaire des Draveurs. - Government Buyer: - Centre de services scolaire des Draveurs - Scope of Work: - Draining and decommissioning the existing water tower - Disconnecting water pipes, electrical systems, and control equipment - Demolition or dismantling of the old structure - Excavation and foundation preparation for a new adiabatic cooler - Construction of new foundations and support structures - Installation of the new adiabatic cooler - Connection to existing water and plumbing networks - Installation of pumps, valves, pipes, and control systems - Installation of electrical components and alarm/monitoring systems - Protection against freezing and insulation - Leak, pressure, and water quality testing - Disinfection and commissioning of the new system - Compliance verification with municipal, sanitary, and fire standards - Site cleanup and restoration - Products/Services Requested: - Water tower replacement and installation services (no specific OEMs, part numbers, or quantities provided) - Unique/Notable Requirements: - Work must be scheduled to avoid school vacations and noisy/odorous work must occur outside regular hours - Bidders must hold necessary licenses and provide a bid bond - Compliance with municipal, sanitary, and fire standards is mandatory - No specific OEMs or vendors are named in the notice.

Description

The Centre de services scolaire des Draveurs is requesting bids for the replacement of the water tower at École Polyvalente de l'Érablière in Gatineau, Québec. The scope includes draining and decommissioning the old tower, demolition, excavation, foundation work, installation of a new adiabatic cooler, connection to existing water and plumbing networks, installation of pumps and control systems, electrical work, testing, disinfection, compliance verification, and site cleanup. The project duration is estimated at 10 months with specific work restrictions during school vacations and noise-sensitive hours. Bidders must submit sealed bids by June 4, 2026, and meet licensing and bonding requirements.

View original listing