Opportunity

Seal Beach Planet bids #CIP SD2502

Seal Beach Stormwater Treatment Improvements: Aqua-Swirl and ARS-CL Equipment Procurement and Installation

Posted

May 06, 2026

Respond By

May 27, 2026

Identifier

CIP SD2502

NAICS

237110, 237990, 237310

The City of Seal Beach is seeking bids for stormwater treatment improvements at Galleon Way and Electric Avenue under project CIP SD2502. - Government Buyer: - City of Seal Beach Public Works Department - Office of the City Clerk - OEMs and Vendors: - Aqua-Swirl (trash capture device) - ARS-CL (fixed curb-opening screen) - Products and Services Requested: - Aqua-Swirl Trash Capture Unit (Aqua-Swirl AS-6S BYP), quantity: 1 - Owner-furnished ARS-CL fixed curb-opening screen, quantity: 1 - 12-inch HDPE pipe, DR 17, quantity: 30 linear feet - 15-inch HDPE pipe, DR 17, quantity: 54 linear feet - Mechanical couplers for Aqua-Swirl device, quantity: 2 - Concrete collars, quantity: 2 - Cast-in-place reinforced concrete junction structure with manhole - 21-foot curb opening catch basin - Removal of existing 30-inch reinforced concrete pipe - Sidewalk removal and replacement - Mobilization, traffic control, dewatering, and as-built plan documentation - Unique or Notable Requirements: - Two separate Notices to Proceed: one for procurement of the Aqua-Swirl unit, and one for construction - Project completion required within 60 working days after construction Notice to Proceed - Liquidated damages of $1,000 per calendar day for late completion - Owner will furnish the ARS-CL screen for contractor installation - All work must comply with City bid forms and bonding requirements - Detailed geotechnical evaluations provided for the project site - Estimated contract value: $370,000 - Place of performance: Galleon Way near Electric Avenue, Seal Beach, CA

Description

This solicitation is for the construction and installation of stormwater treatment improvements at Galleon Way and Electric Avenue. The scope includes sawcutting and removing portions of existing sidewalk, curb and gutter, and asphalt roadway for excavation, trenching, shoring, and dewatering. The work involves constructing a catch basin, installing reinforced concrete pipe, concrete collars, and a junction structure, furnishing and installing an Aqua-Swirl trash capture device, and installing an owner-furnished ARS-CL screen. The project also requires removal and disposal of conflicting existing reinforced concrete pipe, backfilling, restoring disturbed surfaces, and completing all incidental work necessary for project completion.

View original listing