Opportunity
Quebec SEAO #20144031
Water Tower Replacement Construction at École Polyvalente de l'Érablière, Gatineau
Posted
May 07, 2026
Respond By
June 04, 2026
Identifier
20144031
NAICS
237110
This opportunity involves the replacement of the water tower at École Polyvalente de l'Érablière in Gatineau, Quebec, managed by the Centre de services scolaire des Draveurs. - Government Buyer: - Centre de services scolaire des Draveurs (school service center) - Scope of Work: - Decommissioning and draining the existing water tower - Disconnecting water lines, electrical systems, and control equipment - Demolishing the old structure and excavating for new foundations - Constructing new support structures and installing a new adiabatic cooler - Connecting to existing plumbing and water networks - Installing pumps, valves, conduits, control systems, electrical components, and alarm/monitoring systems - Providing freeze protection and equipment insulation - Conducting leak, pressure, and water quality testing, disinfection, and commissioning - Ensuring compliance with municipal, sanitary, and fire standards - Restoring the site after completion - Products/Services Requested: - Water tower replacement construction services (no specific OEMs or part numbers provided) - Notable Requirements: - Adherence to the Charte de la langue française - Valid Revenu Québec attestation required - Restrictions on noisy or odorous work during normal hours - Estimated Contract Value: - CAD 3,669,477.38 - Place of Performance: - École Polyvalente de l'Érablière, 500, rue de Cannes, Gatineau, QC, J8V 1J6
Description
Le Centre de services scolaire des Draveurs sollicite des soumissions pour le remplacement de la tour d’eau à l’école Polyvalente de l’Érablière située à Gatineau, Québec. Les travaux incluent la vidange et mise hors service de l'ancienne tour d'eau, démolition, excavation, construction des nouvelles fondations, installation du nouveau refroidisseur adiabatique, raccordement aux réseaux existants, installation des systèmes électriques et de contrôle, tests et mise en service du nouveau système. Les travaux doivent débuter le 25 juin 2026 et se terminer au plus tard le 23 avril 2027. Une visite des lieux est prévue le 19 mai 2026 à 10 h.