Opportunity

University of Washington Workday #208839

UW Medical Center Procedure Room Renovation and Stryker Equipment Installation

Posted

May 06, 2026

Respond By

June 03, 2026

Identifier

208839

NAICS

236220, 238210, 238290, 238220, 238990

This opportunity involves the renovation and technology upgrade of multiple procedure rooms at the University of Washington Medical Center (UWMC), with a focus on Stryker medical equipment: - Government Buyer: - University of Washington Medical Center (UWMC), Montlake campus, Surgery Pavilion, Digestive Health Department - OEMs and Vendors: - Stryker (primary OEM for equipment booms, integration systems, patient lifts, and A/V equipment) - Products and Equipment Requested: - Stryker S-Series Equipment Management System (ceiling-mounted booms, medical gas risers, power/data infrastructure) - Stryker IP BRAVoE medical communication and integration systems (A/V routers, racks, video encoders/decoders, touch panels) - GoLift patient lifts (models GO-LFT-400, GO-LFT-700, GO-LFT-1000) with rails and hanger bars - 55" 4K surgical and wall displays, HD PTZ cameras, microphones, speakers, and interface plates - Integration cabinets/racks (various sizes), Cat-6A data cabling, electrical panels, and circuit breakers - Wall-mounted fan coil unit and water source heat pump for equipment rooms - Services Requested: - Full interior renovation of procedure rooms (demolition, construction of structural supports, new finishes) - Removal/disposal of existing procedure booms and installation of new Stryker equipment - HVAC upgrades (ductwork, diffusers, air handler units, integration with building management system) - Electrical and data infrastructure upgrades (including above-ceiling work) - A/V system upgrades (room status camera, monitor system, equipment rack installation) - Strict infection control risk assessment (ICRA) and containment measures due to high-risk hospital environment - Unique/Notable Requirements: - Only contractors on the Critical Patient Care Roster A are eligible to bid - Compliance with NFPA 99, local fire, safety, and energy codes - Mandatory pre-bid site meeting and detailed infection control plans (Class IV and III) - Coordination with Stryker for equipment installation and integration - Locations: - UW Medical Center Surgery Pavilion, 1959 NE Pacific St, Seattle, WA 98195 (primary place of performance) - Procedure Rooms #3028, 3030, 3040, 3042, 3044, and Data/Communications Room SP3200E - Digestive Health NORA Rooms 1 & 2 (SP3042 & SP3044) - Period of Performance: - Single-phase construction project; specific duration not stated, but project is in design/permitting with construction to follow - Estimated Contract Value: - Likely in the $2,000,000 to $5,000,000 range based on scope and equipment - Potential Competitors: - Other major medical equipment OEMs (e.g., Getinge, Hillrom/Baxter, Dräger, Steris) may offer similar solutions

Description

This project involves the interior renovation of two existing NORA procedure rooms totaling approximately 620 square feet on Level Three of the Surgery Pavilion at the University of Washington Medical Center, Montlake campus. The work supports upgrading existing procedural room booms and associated infrastructure, including removal and disposal of existing booms, renovations to accommodate new equipment, HVAC upgrades, electrical work, and A/V system upgrades. The contractor must coordinate with the Owner's equipment vendor for installation and provide on-site support. Infection Control Risk Assessment procedures will be implemented throughout construction.

View original listing