Opportunity

City of Long Beach Buyspeed #UD-26-325

Sanitary Sewer Rehabilitation and Replacement Program (SSRRP) Project 11 Solicitation

Posted

March 17, 2026

Respond By

May 06, 2026

Identifier

UD-26-325

NAICS

237110, 237990

The Long Beach Utilities Department is seeking bids for the Sanitary Sewer Rehabilitation and Replacement Program (SSRRP) Project 11. - Government Buyer: - Long Beach Utilities Department, Engineering Bureau - Scope of Work: - Rehabilitation of approximately 72 sewer segments - Methods include: - Full pipe CIPP (Cured-In-Place Pipe) liner installation - Point repair pipe replacement - Wye replacement - Sewer jetting - Root ball removal - Top hat installation - Additional services: - CCTV inspections - Traffic control and restriping - Sewer bypassing - Surface restoration - Mobilization/demobilization - Excavation safety measures (including OSHA permit) - Construction information signs - Temporary bypass facilities with a sewage spill prevention plan - Products/Services Requested: - Mobilization/Demobilization (1 unit) - Excavation Safety Measures, including OSHA permit (1 unit) - Traffic Control and Restriping (1 unit) - Construction Information Signs (4 units) - Temporary Bypass Facilities and Sewage Spill Prevention Plan (1 unit) - Comprehensive sewer rehabilitation services (approx. 72 segments) - Unique/Notable Requirements: - Multiple rehabilitation methods required for different segments - OSHA permit for excavation safety - Sewage spill prevention plan mandatory - Traffic control and public information signage required - No specific OEMs or brands are mentioned in the solicitation. - All relevant specifications, drawings, and addenda are provided as attachments.

Description

This solicitation is for the Sanitary Sewer Rehabilitation and Replacement Program (SSRRP) Project 11. The work involves rehabilitating approximately 72 sewer segments using methods such as full pipe CIPP liner, point repair pipe replacement, wye replacement, sewer jetting, root ball removal, and top hat installation. The project also includes CCTV inspections, traffic control, sewer bypassing, and surface restoration. A virtual pre-bid meeting is recommended for bidders.

View original listing