Opportunity

Massachusetts COMMBUYS #BD-26-1339-UXBDP-DPW-127713

Douglas Street Water Main Replacement Project – 12-inch Ductile Iron Pipe Installation

Posted

April 08, 2026

Respond By

May 06, 2026

Identifier

BD-26-1339-UXBDP-DPW-127713

NAICS

237110, 237990

This opportunity is for the Douglas Street Water Main Replacement Project in Uxbridge, MA, managed by the Town of Uxbridge Department of Public Works (DPW). - Government Buyer: - Town of Uxbridge Department of Public Works (DPW) - Project Scope: - Replacement of approximately 7,550 linear feet of existing 8-inch water main with new 12-inch ductile iron pipe along Douglas Street - Work extends from Hunter Road to east of the Route 146 intersection - Includes connections to side streets - Installation of approximately 60 new water services - Installation of 17 new hydrants - Abandonment of the existing 8-inch water main in place - Products/Services Requested: - 12-inch ductile iron pipe (main product) - Water service connections - Fire hydrants - Notable Requirements: - All work to be bid on a unit price basis - No specific OEMs or vendors are named in the solicitation - Emphasis on ductile iron pipe and new hydrant installation - No administrative or procedural contract vehicle details included

Description

This solicitation is for the replacement of approximately 7,550 linear feet of existing single-feed 8-inch water main with new 12-inch ductile iron pipe along Douglas Street from Hunter Road to east of the Route 146 intersection. The project includes connecting side streets, installing approximately 60 new water services, and 17 new hydrants. The existing 8-inch water main will be abandoned in place. Bids are to be submitted on a unit price basis.

View original listing